
Silt build up closes Jerry F. Costello Lock
The St. Louis Engineer District reports that the Jerry F. Costello Lock closed to traffic on August 19 when it could no longer close its downstream miter gates due to silt and
The St. Louis Engineer District reports that the Jerry F. Costello Lock closed to traffic on August 19 when it could no longer close its downstream miter gates due to silt and
Louisiana elected officials, federal partners and maritime stakeholders joined the Big River Coalition in New Orleans, August 16, to celebrate the U.S. Army Corps of Engineers (USACE) completion of the first two
Donjon Marine Co. Inc., Hillside, N.J., has been awarded a $23,970,800 contract for maintenance dredging of Flushing Bay and Creek, Queens, N.Y. Bids were solicited via the internet with two received. Work
Andrea L. Williams has been named Operations Division chief at the U.S. Army Corps of Engineers Memphis District. In that role she is responsible for the operation and maintenance of the district’s
The U.S. Army Corps of Engineers, St. Paul District, has released a draft Environmental Assessment, or EA, for a proposed end cell project at Lock and Dam 4, near Alma, Wis., and
The U.S. Army Corps of Engineers (USACE) Vicksburg District says it will temporarily close Lindy C. Boggs Lock and Dam (L&D) to navigation on the Red River during two separate periods. It
The Rock Island Engineer District says it will begin daytime closures of the Brandon Road Lock located in Joliet, Illinois, beginning May 9, to facilitate installation of bulkhead recesses which will later
The Nashville Engineer District has issued a public notice advising that Cheatham Lock at Cumberland River Mile 148.7 will be closed to navigation beginning at 0600 16 May 2022 and continuing through
The Mississippi River Commission will conduct its annual high-water inspection trip on the Mississippi River, April 4 – 8. Four public meetings are scheduled aboard the M/V Mississippi in selected towns along
The Buffalo Engineer District is making more than $16 million in upgrades to the breakwaters that protect critical infrastructure in Cleveland Harbor. As part of multiple projects, repairs and extensions are being