
Rising water at Carrollton Gage prompts inspections
The Mississippi River at the Carrollton Gage in New Orleans, La., has risen above 11 feet, prompting the U.S. Army Corps of Engineers, New Orleans District, to activate Phase I flood fight
The Mississippi River at the Carrollton Gage in New Orleans, La., has risen above 11 feet, prompting the U.S. Army Corps of Engineers, New Orleans District, to activate Phase I flood fight
The Memphis District, U.S. Army Corps of Engineers (USACE), has lowered its flood fight activation level to Phase I in the Cairo, Missouri, and Reelfoot-Obion Areas due to falling Mississippi River levels.