Search Results for: ferries

  • News

Pacific Maritime: A vital maritime cluster

 “In the more than seven years that Shell has held leases in the Chukchi, it has only recently been allowed to complete a single well. What we have here is a case in which a company’s commercial efforts could not overcome a burdensome and often contradictory regulatory environment,” says Murkowski. “The Interior Department has made no effort to extend lease terms, as recommended by the National Petroleum Council. Instead, Interior placed significant limits on this season’s activities, which resulted in a drilling rig sitting idle, and is widely expected to issue additional regulations in the coming weeks that will make it even harder to drill. Add this all up, and it is clear that the federal regulatory environment—uncertain, ever-changing, and continuing to deteriorate—was a significant factor in Shell’s decision.”

Murkowski made the point that just because the U.S. has created a difficult environment for offshore drilling in the Arctic, it doesn’t mean other countries have. “Development in the Arctic is going to happen—if not here, then in Russia and Canada, and by non-Arctic nations,” says Murkowski. “I personally believe that America should lead the way. The Arctic is crucial to our entire nation’s future, and we can no longer rely solely on private companies to bring investments in science and infrastructure to the region. As the Arctic continues to open, we urgently need to accelerate our national security investments in icebreakers, ports, and other necessities.”

Some Congressional opponents of Arctic drilling applauded Shell’s move. Senator Jeff Merkley (D-OR) called offshore Arctic drilling “unacceptable” and irresponsible. Rep. Jared Huffman (D-CA) went so far as to introduce the Stop Arctic Ocean Drilling Act of 2015, which would prohibit new or renewed oil and gas leasing in the Arctic Ocean Planning Areas of the Outer Continental Shelf.

But this should probably be viewed more like a pause as opposed to a full stop. A more favorable regulatory environment for Arctic offshore drilling could develop if a Republican is in the White House in 2017 backed by a Republican-controlled Congress. Additionally, cheap oil and gas should also increase consumption and eventually lead to higher prices and make Arctic drilling more economically attractive.


 Shipyards, naval architects team on projects

Portland, OR, headquartered Vigor Industrial, the largest shipyard group in the Pacific Northwest with 12 facilities in Alaska, Washington, and Oregon, had bolstered its capabilities in anticipation of an increased workload. It added an 80,000-ton lifting capacity dry dock to enhance its ship repair and maintenance capabilities and merged with Kvichak Marine Industries, Seattle, WA, to add capabilities in new aluminum vessel construction. Vigor had supported Shell’s earlier efforts in Alaska, including the activation of the drilling barge Kulluk, and more recently repaired the damaged icebreaker Fennica.

Vigor is part of a vibrant Washington State maritime cluster that includes logistics and shipping, fishing and seafood, and shipbuilding and repair. According to a recent economic impact study, generated 148,000 direct and indirect jobs and directly creates $15.2 billion in gross business income and has a total impact of $30 billion on the state’s economy.

Back in March, Vigor “christened” its dry dock Vigourous with work on the cruise ship Norwegian Star and followed that up with repairs to the USNS John Glenn and USNS Montford Point. Now Vigor will turn its attention to completing the third Olympic Class 144-car ferry for Washington State Ferries and look forward to building the fourth in the series, which recently received $122 million in funding by the state legislature. There’s plenty of more coverage on the ferry market in this issue, including Seattle-based Elliott Bay Design Group’s support of ferry projects for the New York City Department of Transportation and Texas Department of Transportation.

Pacific Oct2nicholsSpecial launch system
Designed by Seattle-based naval architectural firm Guido Perla Associates, Inc., the144-car ferry is a joint construction effort between Vigor and neighboring Nichols Brothers Boat Builders, Whidbey Island, WA. Nichols Brothers Boat Builders has been contracted to build the superstructure for the first three Olympic Class ferries. Nichols Brothers Boat Builders has used a new track and dolly system developed by Engineered Heavy Service (EHS), Everett, WA, for transferring the ferry superstructures it on to a barge for transport to assembly with the hull at Vigor Fab in Seattle.

That same transfer system is pictured on this month’s cover, to launch the ATB tug Nancy Peterkin, the first of two 136 ft x 44 ft x 19 ft sister ATB tugs being built for Kirby Offshore Marine.

This past May, Gunderson Marine, Portland, OR, had launched the Kirby 185-01, a oil & chemical tank barge.

The Nancy Peterkin’s sister ATB tug, the Tina Pyne, is set for launch this December.

The EHS launch system moved the ATB from the shipyard to the launch ramp. General Construction provided two floating cranes to assist in the final lifting of the vessel, shuttling it to deeper water.

The vessel was towed to Everett, for lightship, stability testing and fuel transfer. Following this the tug will be towed to Nichols Brothers outfitting pier in Langley, WA, located across the Puget Sound from Everett, WA, for final outfitting, dock and sea trials before its final delivery.

Used for vessels greater than 1,000 tons, the new launch system significantly increases the displacement and draft of the vessels that Nichols Brothers can haul and launch in the future. Currently the shipbuilder is engineering to install ridged buoyancy tanks to the side of the launch frame, eliminating the need for the floating cranes in the future.

Nichols Brothers followed up the launch with the signing of a construction security agreement with Kirby Offshore Marine to build two new 120 ft x 35 ft x 19 ft-3 in tugs. Each tug will be powered by two Caterpillar 3516C, 2,447 bhp at 1,600 rev/min main engines with Reintjes reduction gears turning two NautiCAN fixed pitched propellers with fixed nozzles. Karl Senner, Inc., Kenner, LA, supplied the reduction gears for the vessel. These vessels will also have two C7.1 Caterpillar generators for electrical service. Selected deck machinery includes one TESD-34 Markey tow winch, one CEW-60 Markey electric capstan, and one Smith Berger Tow Pin.

Keels will be laid for both vessels this fall with delivery of the first vessel scheduled for May 2017 and the second vessel is scheduled for delivery in November 2017.

Jensen Maritime Consultants, Seattle, the naval architectural and engineering arm of Crowley Maritime, will provide the ABS Class and functional design for the tugboats. These tugboats will carry an ABS loadline, compliant with USCG, as required at delivery.

Nichols Brothers is currently working on the second ATB Tug for Kirby Offshore Marine.

Nichols Brothers spokesperson Lacey Greene says the shipyard has just begun construction of the American Samoa 140 ft Multi-Purpose Cargo/Passenger Ferry, and next year will begin construction on the superstructure and final assembly of the WETA 400-passenger high speed catamarans.

“The vessel construction boom in the Pacific Northwest has impacted the economy in so many different ways,” says Greene. “Specific to our location our community is flourishing. Nichols Brothers is the largest private employer on Whidbey Island in Washington State and employs 300 men and women. We foresee the economic boom expanding even further; the tug market is strong in all aspects, from ATB tugs, tractor Tugs, to line tugs. We also see the passenger vessel industry sector thriving, and we predict additional passenger only high-speed ferries coming down the pipeline as well as leisure vessels.”


 Jensen Maritime is also providing construction management services for the Crowley product tankers under construction at Aker Philadelphia Shipyard. It’s also been busy working on developing LNG bunker barge concepts and recently received approval from ABS for a 452 ft-long ATB version.

Engineering consultant Art Anderson Associates, Bremerton, WA, has been increasing its staff and supporting the development of passenger-only ferry service in Puget Sound. Art Anderson’s Patrick R. Vasicek, PE, LEED AP, will be on hand at the Marine Log FERRIES 2015 Conference & Expo in Seattle to discuss, “An Exportable Life Cycle Assessment Tool for Determining Sustainable Visibility of Passenger-Only Ferry Routes and Systems.”

Ballast water treatment solution
Seattle-based naval architectural and engineering consultancy Glosten reports that Marine Systems Inc. (MSI) has delivered a pair of Ballast Treatment System Deck Modules, designed for tank barge and ship operations.

MSI turned to Glosten to develop the design in response to requests from vessel operators and the first of a kind modular ballast water treatment units combine expertise from Glosten, MSI and Alfa Laval, which provided PureBallast 3.1 treatment systems, Filtrex high efficiency filters, and expertise from hundreds of ballast water management system installations.

The resulting modules, built at the Foss Seattle Shipyard, complete with lighting, ventilation, and integrated controls, were shipped ready for “plug-and-play.”

Each Ballast Module packs a treatment capacity of 1,000 m3/hr within a 20-foot shipping container footprint and is ABS and U.S. Coast Guard approved for hazardous area installations.

Using the module reduces the technical demands on busy shipyards. Rather than juggling independent components and vendors, shipyards can instead focus on fabricating a few well-defined interfaces and foundation system. Each purchased module comes pre-approved by USCG and ABS, is fully tested prior to shipment, and includes integration support from MSI and Glosten engineers.

“The demands of the vessel operator drove this design,” says Kevin Reynolds, Principal at Glosten. “Doing this as a manufactured product ensures that we get it right, every time.”

  • News

Coast Guard to review WSF LNG terminal proposal

The U.S. Coast Guard recently issued a notice in the Federal Register that it would review a proposal by Washington State Ferries (WSF) to modify its marine terminal operations to handle Liquefied Natural Gas (LNG). The LNG would be used to fuel its six Issaquah Class ferries. Last year on June 27, the Coast Guard Sector Puget Sound had received a Letter of Intent (LOI) and a Waterway Suitability Assessment (WSA) from Washington State Ferries to modify their marine terminals to handle LNG.

In accordance with regulation and policy guidance, the Captain of the Port (COTP), Coast Guard Puget Sound Sector, in cooperation with key stakeholders, will review and validate the information in the WSA. Once the COTP reviews the WSA, he will issue a Letter of Recommendation to the Washington Department of Transportation recommending the suitability of the Puget Sound waterways that will be used for LNG marine traffic as it relates to safety and security. Public comments received last November regarding WSF’s proposal will be considered in the development of the COTP’s Letter of Recommendation. Some of the comments received expressed concern about the exposed location of the LNG tanks on the top deck of the converted ferries and how they could potentially pose a security threat. Other comments thought that LNG poses a pollution threat to the environment. The Coast Guard will examine WSF’s Emergency and Operations Manuals covering the LNG transfer system and transfer procedures.

Proposed conversion
Once WSF receives the Letter of Recommendation from the Coast Guard, it will be able to move forward with the retrofit of the first Issaquah Class ferry, which will serve as a proof of concept for the remaining vessels in the class. The diesel-powered ferries carry about 1,200 passengers and 124 vehicles.The state’s ferries, says WSF, are the largest single source of marine carbon emissions in the state. It expects to cut CO2, particulate matter, SOx, and NOx emissions significantly with the use of LNG s a marine fuel. The WSDOT also expects to reap some cost savings, although the picture is not as compelling as it was last year when oil was at $100 per barrel.

During testimony this past January before a State Senate Energy, Environment and Telecommunication Subcommittee, Lynne Griffith, Assistant Secretary of Transportation, Ferries Division, said there would be a $1 per gallon savings when burning LNG as compared with burning Ultra Low Sulfur Diesel. WSF burns about 18 million gallons of fuel annually. The cost of fuel now represents about 23 percent of the Fiscal Year 2013-2015 operating budget as compared with 11 percent in Fiscal Year 2000-2001. Any ferries that would burn LNG would have to be refueled by tanker truck every seven to 10 days.

Incat Tasmania wins super ferry order from Denmark

 

The Hobart shipyard will commence work on construction of the wave piercing catamaran immediately, with delivery scheduled for the first quarter of 2017.

The newbuild super ferry, Incat hull number 088, will be named KatExpress 3, the fast ferry will be an upgraded and more customer-friendly version of near sister-ship vessels KatExpress 1 (Incat hull 066) and KatExpress 2 (Incat 067). The new fast ferry can take up to 1,000 tonnes of cargo, equivalent to up to 1,000 passengers and 417 cars. LikeKatExpress 1 and KatExpress 2, the new fast ferry will carry trucks, campervans, motorcycles and bicycles.

KatExpress 3 is expected to commence operation on the Mols Linien route between Aarhus and Odden and the route between Ebeltoft and Odden in late May 2017.

KatExpress 3 is likely to replace the company’s smallest ferry Max Mols, an Incat 91 m vessel (Incat hull 048) built in 1999.

Incat Chairman, Robert Clifford, in Copenhagen Denmark at the Interferry Conference said “A large ship order to a repeat customer is proof positive of the quality and reliability of the vessels our team build in Tasmania. This is the third Incat ship that Mols Linien have added to their fleet in a period of just four years”.

Incat Tasmania Managing Director Simon Carter said “We have been working on the project for some time, and although the design team still have some finer details to complete, construction will commence immediately”.

“The 250 production staff are currently building four passenger vessels for Manly Fast Ferries, with another six boat order for Sydney Ferries to commence in 2016. This new large ship order will secure work for an expanded workforce for at least a further two years”.

In a statement to the Danish Stock Exchange Mols-Linien announced that since the inauguration of the first super ferry it has increased the number of passenger cars it carries by 58 percent in the period from 2011 to 2014.

Mystery owner asks Incat Crowther to design fast ferry

The main deck allows for four passenger loading stations and features a large cabin, hosting 286 first-class seats, 20 lounge seats, and four handicap accommodation seating areas. The cabin also features a kid’s play area with surrounding seating.

On the aft deck is a cargo room with cargo loading gates, able to fit a portable conveyor belt for efficient loading and unloading. The aft deck also features three restrooms, one of them handicapped accessible.

The mid deck features cabin hosting 144 first-class seats and 32 lounge seats.

Forward of the cabin is the raised wheelhouse, with wing control stations on port and starboard sides. Aft of the cabin, a spacious deck that offers 112 exterior seats. A mini-bar is located in the center of the arrangement with a stage for entertainment behind the cabin.

The upper deck provides a large observation area including 36 exterior seats.Five  MTU 16V400M63L engines power the ferries five Hamilton HM-811 water jets  via ZF-7650 gearboxes, giving it a service speed of 37 knots.

Electrical requirements are met by two 150 ekW generator sets.

A 200hp bow thruster will enhance maneuverability and station keeping.

No word on the shipbuilder.

incat monohull

USCG to review WSF plan to handle LNG at terminals

Last year on June 27, the Coast Guard Sector Puget Sound had received a Letter of Intent (LOI) and a Waterway Suitability Assessment (WSA) from Washington State Ferries to modify their marine terminals to handle LNG. In accordance with regulation and policy guidance, the Captain of the Port (COTP), Coast Guard Puget Sound Sector, in cooperation with key stakeholders, will review and validate the information in the WSA. Once the COTP reviews the WSA, he will issue a Letter of Recommendation to the Washington Department of Transportation recommending the suitability of the Puget Sound waterways the will be used for LNG marine traffic as it relates to safety and security.

Public comments received last November regarding WSF’s proposal will be considered in the development of the COTP’s Letter of Recommendation. Some of the comments received expressed concern about the exposed location of the LNG tanks on the top deck of the converted ferries posed a security threat. Other comments thought that LNG poses a pollution threat to the environment. The Coast Guard will examine WSF’s Emergency and Operations Manuals covering the LNG transfer system and transfer procedures.

Proposed conversion

Once WSF receives the Letter of Recommendation from the Coast Guard, it will be able to move forward with the retrofit of the first Issaquah Class ferry, which will serve as a proof of concept for the remaining vessels in the class. The diesel-powered ferries carry about 1,200 passengers and 124 vehicles.

The state’s ferries, says WSF, are the largest single source of marine carbon emissions in the state. It expects to cut CO2, particulate matter, SOx, and NOx emissions significantly with the use of LNG s a marine fuel.

The WSDOT also expects to reap some cost savings, although the picture is not as compelling as it was last year when oil was at $100 per barrel. During testimony this past January before a State Senate Energy, Environment and Telecommunication Subcommittee, Lynne Griffith, Assistant Secretary of Transportation, Ferries Division, said there would be a $1 per gallon savings when burning LNG as compared with burning Ultra Low Sulfur Diesel. WSF burns about 18 million gallons of fuel annually. The cost of fuel now represents about 23 percent of the Fiscal Year 2013-2015 operting budget as compared with 11 percent in Fiscal Year 2000-2001. Any ferries that would burn LNG would have to be refueled by tanker truck every seven to 10 days.

 

Southwest Shipyard to build diesel electric ferry for TxDOT

Two of this class of ferries were delivered in 2011 and construction of the latest vessel, which is a diesel-electric version, will begin this fall. EBDG will serve as the owner’s representative.

TxDOT is a long-time EBDG client, and the firm has provided support to the agency since 2008. Following the successful completion of a multi-phased design effort for the first two 28-car ferries to offer service between Port Aransas and Harbor Island, EBDG was selected by TxDOT in 2014 to provide four years of on-call support. The first project under the new contract was for the design of the diesel-electric version of the 28-car ferry.

The new ABS-classed diesel-electric ferry has a length of 161 feet overall, a beam of 52 feet, a depth of approximately 11 feet and a draft of 8 feet.

Design updates to the interior, including the propulsion system, will translate into a vessel that has greater built-in redundancy and requires less maintenance over its lifetime.

The new ferry is set to enters service in February 2017.

“EBDG is pleased to be providing the new generation of ferries for Port Aransas,” stated EBDG VP of Engineering, Brian King. “It’s nice to be once again working with TxDOT and Southwest Shipyard for the construction of another ferry. I am confident that Southwest Shipyard will do an excellent job.”