ship repair

USS Fitzgerald is out of dry dock

Naval Sea Systems Command reports that the guided-missile destroyer USS Fitzgerald (DDG 62) has taken another step toward returning to the fleet as a fully ready, combat-capable ship. The ship achieved a

T-AKE 7

Vigor wins $17 million MSC contract

Vigor Marine Inc., Portland, OR, has been awarded a $17,044,892 contract for a 75-calendar day shipyard availability for the regular overhaul and drydocking of USNS Carl Brashear (T-AKE 7). Work will include

BAE Hawaii awarded $9.6 million for DDG 97 SIA

JANUARY 16, 2019 — BAE Systems Hawaii Shipyards Inc., Honolulu, Hawaii, has been awarded a $9,576,151 contract modification for scheduled Surface Incremental Availability (SIA) on USS Halsey (DDG 97). The scheduled SIA