
Solstad Offshore returns to Gibdock
JUNE 19, 2015 — Solstad Offshore’s 5,000 dwt Construction Support Vessel (CSV) Normand Pacific recently arrived at Gibraltar ship repair company Gibdock for its first special survey.Gibdock has built up a close
JUNE 19, 2015 — Solstad Offshore’s 5,000 dwt Construction Support Vessel (CSV) Normand Pacific recently arrived at Gibraltar ship repair company Gibdock for its first special survey.Gibdock has built up a close
JUNE 5, 2014 — Verreault Navigation, Les Méchins, Québec, Canada, is under taking a major expansion of its dry dock that will take its size to 800 ft (244 m) long by
MAY 4, 2015— Curaҫao could soon offer additional ship repair options. Damen Shipyards Group is cooperating with Nederex BV to provide ship repair services in Curaҫao’s St. Anna Bay area. Those plans
APRIL 21, 2015 — BAE Systems commemorated the 100th anniversary of its Norfolk, VA, shipyard this past weekend with a special event for employees and their families. The company, known for many
APRIL 17, 2015 — Global Marine Systems Limited’s 145.5 m cable layer Cable Innovator recently left Damen Shiprepair Dunkerque, France, after extensive work that included the installation of a ballast water treatment
APRIL 10, 2015 — BAE Systems San Diego Ship Repair, San Diego, CA, is being awarded a $35,139,444 modification to previously awarded cost-plus-award-fee/incentive-fee contract (N00024-12-C-4403) for USS Comstock (LSD 45) fiscal 2015
MARCH 26, 2015 — An ambitious plan that would see the Caribbean get two of the largest graving dock facilities in the world has taken a step forward. The Trinidad Dry Dock
MARCH 26, 2015 — BAE Systems San Diego Ship Repair, San Diego, CA, is being awarded a $16,771,463 modification to previously awarded cost-plus-award-fee/incentive-fee contract (N00024-10-C-4407) for amphibious transport dock ship USS San
FEBRUARY 18, 2015 — BAE Systems Norfolk Ship Repair, Norfolk, VA, is being awarded a $38,295,822 modification to a previously awarded contract (N00024-10-C-4308) for USS Mahan (DDG-72) fiscal 2015 docking selected restricted
JANUARY 30, 2015 — BAE Systems Norfolk Ship Repair, Norfolk, VA, is being awarded a $6,976,389 firm-fixed-price contract for 43-calendar day shipyard availability for the Mid Term Availability of USNS Leroy Grumman