littoral combat ship

  • News

Engineering stand down, retraining for LCS crews

SEPTEMBER 6, 2016 — Following the recent engineering casualty on the littoral combat ship USS Freedom (LCS 1), Commander, Naval Surface Forces, Vice Adm. Tom Rowden, ordered an engineering stand down for

Navy accepts delivery of LCS 7

AUGUST 16, 2016 —The Navy accepted delivery of the future USS Detroit (LCS 7) in a ceremony at the Fincantieri Marinette Marine shipyard, Aug. 12. Detroit is the eighth littoral combat ship

Austal-built LCS 6 completes shock trials

JULY 20, 2016 —Naval Sea Systems Command (NAVSEA) reports that the Independence variant Littoral Combat Ship USS Jackson (LCS 6) has successfully completed Full Ship Shock Trials (FSST) off the coast of

Lockheed Martin awarded $10.6 million for LCS 5 PSA

JULY 11, 2016 — Lockheed Martin, Mission Systems and Training, Baltimore, MD, is being awarded $10,676,521 for cost-plus-award-fee order ER06 against a previously awarded basic ordering agreement (N00024-15-G-2303) to provide engineering and

LCS 8 completes acceptance trials

MAY 16, 2016 — Austal USA reports that Littoral Combat Ship Montgomery (LCS 8), the fourth Independence-variant LCS built at its Mobile, AL, shipyard, successfully completed its acceptance trials May 6, 2016,