shoreside

Dr. Andreas Bodén, CTO, PowerCell Group

Op-Ed: Shoring up shore power connections

By Dr. Andreas Bodén, CTO, PowerCell Group Shore power infrastructure in ports is currently limited, and when multiple ships try to connect at once it can easily require more power than the

  • News

BP Shipping to use Jeppesen VVOS on 52 vessels

NOVEMBER 14, 2012 —  BP Shipping has finalized a contract with Boeing subsidiary Jeppesen that will see the installation of Jeppesen’s Vessel and Voyage Optimization Solution (VVOS) on 52 BP vessels carrying