Jan De Nul orders next gen plug-in hybrid TSHD
Jan De Nul Group has signed a contract with India’s Goa Shipyard Limited (GSL) for the construction of a next generation, plug-in hybrid TSHD (trailing suction hopper dredge). With a length of
Jan De Nul Group has signed a contract with India’s Goa Shipyard Limited (GSL) for the construction of a next generation, plug-in hybrid TSHD (trailing suction hopper dredge). With a length of
Upping the ante in the cable layer market, Belgium’s Jan de Nul Group has placed an order at the CMHI shipyard in China for an extra-large cable-laying ship. Set for delivery in
Propulsion system specialist Schottel, Spay, Germany, has introduced a new rudder propeller optimized for DP (dynamic positioning) use. Meeting the growing requirements for W2W (walk-to-work) vessels to operate efficiently and reliably, the
The Jan De Nul Group has ordered a high-end crane simulator to support its two next-generation offshore installation vessels, Voltaire and Les Alizés. The crane simulator will be based on real physics
Extending an existing 10-year relationship, dredging and installation vessel giant Jan De Nul has signed a new agreement with W&O, a leading supplier of valves, actuators, pipes and fittings to the global
The CMHI Haimen shipyard in China has floated out Jan De Nul’s giant crane ship Les Alizés. Aimed at the offshore renewables and decommissioning market, it will be the largest heavy lift
The Jan De Nul Group has signed a long-term contract with Netherlands-based satellite communications specialist Castor Marine to provide global VSAT internet and Iridium L-Band services to its entire fleet of almost
The main propulsion package for Jan De Nul’s latest heavy-lift crane vessel Les Alizés has left the Schottel production plant in Wismar, Germany, on its way to the CMHI Haimen shipyard in
Luxembourg-based Jan De Nul Group reports that it is the buyer of the of the offshore construction and cable-lay vessel Connector. Last Friday, vessel owning company Ocean Yield ASA disclosed that it
Jan De Nul Group’s trailing suction hopper dredge Alexander von Humboldt recently completed 2,000 hours operation on 100% renewable, second-generation biofuel oil (BFO). The Alexander von Humboldt is a twin-screw vessel, with