![Holt Lock in the Mobile Engineer District.](https://www.marinelog.com/wp-content/uploads/2024/07/Holt1-300x225.jpg)
Holt Lock faces closure due to stability concerns
The Mobile Engineer District recently announced the closure of the Holt Lock to navigation in late June. The Corps says the closure is necessary due to recent findings from an initial stability
The Mobile Engineer District recently announced the closure of the Holt Lock to navigation in late June. The Corps says the closure is necessary due to recent findings from an initial stability
Due to high water, the St. Paul Engineer District closed several Mississippi River locks and dams to all commercial and recreational traffic this past weekend and anticipates more closures in the coming
The Pittsburgh Engineer District received new and increased authorizations to support water infrastructure and civil works projects within its 26,000 square-mile region with the approval of the Water Resources Development Act (WRDA)
J.F. Brennan Co. Inc., La Crosse, Wis., has been awarded a $23,484,700 firm-fixed-price contract for Illinois River Basin, Brandon Road Lock and Dam, Miter Gate installation and machinery replacement. Work will be
The U.S. Army Corps of Engineers will hold a virtual public meeting on Thursday, July 7 at 6 p.m. (EDT) regarding its preparation of the Regional Master Plan Update for six locks
A bipartisan group of members of Congress has written the U.S. Army Corps of Engineers urging that it prioritize funding for construction of the Navigation and Ecosystem Sustainability Program (NESP) on the
The American Waterways Operators (AWO) says that it applauds the passage of the bipartisan infrastructure bill, H.R. 3684, signed into law by President Joe Biden earlier this week. AWO notes that the
The St. Paul Engineer District is preparing for major repairs at six of its Mississippi River locks this winter to ensure they continue working as designed. Maintenance is scheduled at Lock and