Kentucky Emergency and Environment Cabinet (EEC) tweeted this photo of breakaway barges piled against dam.

Methanol barge removed from McAlpine Dam

In an update to the March 28 barge breakaway at McAlpine Lock and Dam, work crews pumped methanol from a stranded tank barge into a nearby receiver tank barge and completed the

EcoPeller upper gearbox

Schottel ships its largest-ever EcoPeller

Schottel’s Wismar, Germany, production facility has just shipped the largest EcoPeller ever manufactured by the propulsion specialist. The five-bladed SRE 700 has a propeller diameter of 3.6 meters and an input power