![](https://www.marinelog.com/wp-content/uploads/2017/09/2d5a3af9f216787030490aeb08842613-300x225.jpg)
TxDOT awards ferry design contract
AUGUST 31, 2017 — The Shearer Group, Inc. (TSGI) has recently been awarded a five-year indefinite deliverable contract with the Texas Department of Transportation (TxDOT). TSGI will provide design, engineering and construction