Langh to supply scrubbers for two cruise newbuilds
APRIL 28, 2016 — Finland’s Langh Tech is to deliver exhaust gas scrubber systems to two large cruise vessels under construction at Meyer Werft. The two Norwegian Cruise Line Breakaway Plus class
APRIL 28, 2016 — Finland’s Langh Tech is to deliver exhaust gas scrubber systems to two large cruise vessels under construction at Meyer Werft. The two Norwegian Cruise Line Breakaway Plus class
JUNE 18, 2013 — Ship repairer Elgin Brown and Hamer (EBH) Namibia has acquired a third floating dry dock. The 195 m long, 15,000 ton lift capacity Panamax dock will increase capacity