![](https://www.marinelog.com/wp-content/uploads/2017/10/1a8fa331e6ed57e2de20d9d20535f914-300x225.jpg)
GTT will design cryogenic tanks for LNG fueled CMA CGM box ships
NOVEMBER 8, 2017 — GTT has been chosen by Hudong-Zhonghua Shipbuilding (Group) Co. Ltd. and by the shipowner to design the cryogenic tanks for the nine LNG fueled 22,000 TEU containerships ordered