Q&A: Meet the women behind Royal Barge Fleeting
Marine Log (ML): First off, tell us about Royal Barge Fleeting and how it got started? Jessica Branham (JB): I was approached by a member of Cummings Marine Board of Directors in
Marine Log (ML): First off, tell us about Royal Barge Fleeting and how it got started? Jessica Branham (JB): I was approached by a member of Cummings Marine Board of Directors in
Boston Ship Repair, Boston, Mass., has been awarded a $13,824,169 firm-fixed-price contract for a 98-calendar day shipyard availability for a regular overhaul and drydocking of the Military Sealift Command expeditionary fast transport
The Military Sealift Command’s Lewis B. Puller-class expeditionary sea base USS Hershel “Woody” Williams (ESB 4) completed its first Regular Overhaul (ROH) in the European area of operations at the Palumbo Shipyard
When a 9,280 horsepower towboat returned to service following extensive repairs at the James Marine Paducah River Service yard in Kentucky, it marked the first application of Thordon’s new seal-embedded bearing to
Everett Ship Repair in Everett, Wash., has recently completed hull repairs and upgrades on the MV Excellence, a fisheries mothership processing vessel built in the 1970s in Japan. The 367.5 x 56
Boston Ship Repair, Boston, Mass., has been awarded a $14,759,604 firm-fixed-price contract (N3220523C4015) for a 75-calendar day shipyard availability for the regular overhaul/drydocking of Military Sealift Command’s fleet replenishment oiler USNS Patuxent
By Muammer Akturk, ABS Senior Surveyor Amendments to the International Convention on the Control of Harmful Antifouling Systems on Ships (AFS Convention) adopted by the IMO ban the presence of cybutryne in
Detyens Shipyards Inc., North Charleston, S.C., has been awarded a $21,007,304 contract (N3220523C4017) for a 91-calendar day shipyard availability for the regular overhaul/drydocking availability of the Military Sealift Command‘s Henry J. Kaiser-class
Fort Lauderdale, Fla., based Resolve Marine reports that its 207-foot response vessel Resolve Pioneer has completed its ABS special survey and received its U.S. Coast Guard (USCG) certificate of inspection following a
Portland, Oregon, headquartered Vigor Marine LLC, , has been awarded a $131,151,747 firm-fixed-price contract action to accomplish the Arleigh Burke class guided missile destroyer USS John Paul Jones (DDG 53) 2C1 drydocking