Search Results for: container handling

  • News

Bunkering Up

Last year, General Dynamics NASSCO earned the bragging rights for building and delivering the world’s first LNG-fueled containership, the Isla Bella, to Jones Act operator TOTE Maritime. The San Diego shipbuilder capped off that technological achievement last month by delivering the 764 ft Perla del Caribe, sister ship to the Isla Bella, two months early.

The two ships were built under a contract signed by TOTE in December 2012. The investment by TOTE in the two ships was $375 million.
 
TOTE President and CEO Anthony Chiarello, says that the “Isla Bella is already serving the people and communities of Puerto Rico and we are excited to introduce the Perla Del Caribe into the trade next month.”

 

GD NASSCO designed the ships in partnership with DSEC, a subsidiary of Daewoo Shipbuilding & Marine Engineering (DSME), located in Busan, South Korea.

The design is based on proven containership-design standards and includes DSME’s patented LNG fuel-gas system and a MAN ME-GI dual fuel, slow-speed engine. The 8L70ME-GI engine was built by Korea’s Doosan Engine under license from MAN Diesel & Turbo.

Burning LNG will allow the Marlin Class ships to be fully compliant with strict emissions regulations while operating in both the North American Emissions Control Area and the U.S. Caribbean ECA.

The Isla Bella made its first trip from Jacksonville, FL, to San Juan, Puerto Rico, November 24.

ToteIslaOn January 9, TOTE Maritime Puerto Rico successfully loaded LNG bunkers aboard the world’s first LNG powered containership, MV Isla Bella. Approximately 100,000 LNG gallons transported by 12 TOTE-owned LNG ISO containers were loaded on schedule. The bunkering was conducted under strict U.S. Coast Guard oversight while Isla Bella was also undergoing cargo operations.

The LNG was transferred from the ISO tank containers using a specially developed transfer skid developed by TOTE’s partner Applied Cryogenics Technologies (ACT) of Houston, TX. The transfer skid is designed to allow four ISO tanks to be transferred to Isla Bella at once, dramatically reducing transfer time.

The LNG was sourced by TOTE’s partner, JAX LNG, LLC, from AGL Resources’ LNG production facility in Macon, GA. Genox Transportation, a specialized LNG trucking partner of TOTE, transported the fuel to Jacksonville. Pivotal LNG, a subsidiary of AGL Resources, also provided transfer expertise to TOTE Maritime with its highly trained LNG experts, ensured the operation was conducted safely and in accordance with best industry practices.

Oversight of the operation both at shipside and on shore was provided by TOTE Services, Inc. (TSI), TOTE Maritime’s sister company that manages the vessels.

“We are very pleased with the results of this initial LNG bunker event and know that the use of LNG in our Marlin Class vessels will provide unprecedented environmental benefits both here in Jacksonville and in Puerto Rico,” says Tim Nolan, President of TOTE Maritime Puerto Rico. “We are indebted to USCG Sector Jacksonville for their diligent oversight and assistance that was invaluable and helped make this event a success. Our partners ACT, Pivotal LNG and Genox were also major components of our success. Our sister company, TSI, has developed significant expertise in LNG as a Maritime fuel and ensures that our vessels operate safely and efficiently using this environmentally superior fuel.”

Applied CryoTechnologies, Inc. (ACT) is the premier equipment supplier for cryogenics in North America. ACT is proud to be the first to market with this type of bunkering equipment for the marine industry. Leveraging ACT’s innovative style and unrivaled experience in LNG equipment is sure to bring success to any LNG fueling project.

Pivotal LNG brings liquefied natural gas to companies and industries throughout the United States through reliable, flexible and cost-effective solutions.

TOTE Maritime provides safe, reliable transportation at the fastest speed possible for the Puerto Rican and related Caribbean trades.

Meanwhile, Crowley Puerto Rico Services, Inc., Jacksonville, has selected Eagle LNG Partners as LNG supplier for the company’s new LNG-powered, Commitment Class ships, which will be delivered in 2017 for use in the U.S. mainland to Puerto Rico trade. To support Crowley’s LNG needs, Eagle LNG will build an LNG plant offering a capacity of 200,000 gallons per day (87,000 gallons per day initially) in Jacksonville. The state-of-the-art facility is slated to be operational by early 2017.

The decision to partner with Eagle LNG was made by Crowley in part because of the companies’ shared commitment to the environment.

“Crowley is proud to take a leadership position in the industry’s shift to cleaner-burning, natural gas fuel solutions,” said Crowley’s John Hourihan, senior vice president and general manager, Puerto Rico services. “The partnership with Eagle LNG is an important first step in developing sustainable supply infrastructure to ensure these highly technical, environmentally friendly vessels operate to their full capability.”

“The marine sector represents a significant opportunity for LNG fueling in the U.S., and Eagle LNG is well-positioned to build the necessary infrastructure and provide the specialized logistics to facilitate this energy transformation,” said Dick Brown, CEO, Eagle LNG. “It takes companies like Crowley to lead that wave of change. Eagle LNG is proud to work with such a pioneering organization.”

“This project is an important investment in our community from both economic and environmental perspectives,” said Jacksonville Mayor Lenny Curry. “It clearly demonstrates the leadership role our region is playing in LNG development and progression, while strengthening our commitment to leaving a smaller footprint through cleaner-burning fuel.”

The supply agreement between Eagle LNG and Crowley will provide LNG fuel for the El Conqui and Taino, which are expected to be in service in the second quarter and fourth quarter of 2017 respectively.  The Jones Act ships will replace Crowley’s towed triple-deck barge fleet, which has served the trade continuously and with distinction since the early 1970s. These new ships, will offer customers fast ocean transit times, while accommodating the company’s diverse equipment selection and cargo handling flexibility – benefits customers have enjoyed for nearly 60 years.  The LNG plant is separate from the previously announced Eagle LNG Federal Energy Regulatory Commission (FERC) export terminal located along the St. Johns River, in Jacksonville, which will continue to focus on export markets in the Caribbean and Atlantic Basin.

DUAL FUEL BULKERS BUILT TO NEW DNV GL CLASS
ESL Shipping’s new dual-fuelled bulk carriers will not only be the first large LNG-fuelled bulkers, but the first vessels constructed to the new DNV GL rule set. Due for delivery in early 2018, the two highly efficient 25,600 dwt vessels are optimized for trading in the Baltic Sea region.

“It is fitting that the first vessels that will be constructed to the most forward looking set of classification rules are themselves at the cutting edge of maritime innovation,” says Knut Ørbeck-Nilssen, CEO of DNV GL – Maritime. “We have created these rules to be ready for the future and we have long pioneered the use of LNG as a ship fuel. To see these two come together in a double first for the industry is a remarkable moment. We look forward to working with ESL, Deltamarin, Sinotrans & CSC Qingshan Shipyard and all the project partners to make this project a success.”

“We are proud to be the world’s first shipyard applying the new and innovative DNV GL rules for a newbuilding, just two months after DNV GL has launched its new rules in October this year,” said Liu Guangyao, Deputy General Manager of Sinotrans & CSC at the Marintec China Trade Fair recently. “We appreciate the support that DNV GL has committed to provide on the project during both the design and construction phase, especially in a project with many advanced extra class notations. We are looking forward to a close cooperation and a successful delivery.”

Featuring the Deltamarin B.Delta26LNG design, the two highly efficient ships will feature dual-fuel main and auxiliary machinery, resulting in CO2 emissions per ton of cargo transported half that of present vessels. The bulk carriers will be built to the new DNV GL rules for general dry cargo ships with DNV GL ice class 1A and will have type C LNG tanks of approximately 400 m3 capacity enabling bunkering at several terminals within the Baltic region. The B.Delta26LNG has a shallow draft of maximum 10 m, an overall length of 160 m, and a breadth of 26 m.

“We are very excited to have been selected to take part in this ground breaking project,” says Morten Løvstad, Business Director Bulk Carriers at DNV GL. “Being asked to work with such an innovative team as the classification partner is a testament to the creativity and hard work that so many colleagues at DNV GL have invested in the new rule set. These vessels will set new standards for efficiency and environmental performance. They are an important step forward in showing how shipping can be a force for sustainability today and in the future.”

FIRST PURE LNG FERRY FOR GERMANY
Germany’s first LNG-fueled ferry, the MS Ostfriesland, has now been  operating for AG Ems between Emden and Borkum Island on the ecologically sensitive Wadden Sea, since June 2015.

Originally built in 1985, the vessel was converted to dual fuel propulsion in a conversion that saw it fitted with a complete new aft end, construction of which got underway at German shipyard  Brenn – und Verformungstechnik Bremen GmbH while the ship remained in service.

The new aft section, which extended the vessel’s length from 78.7 m to 93 m, houses the new machinery space and LNG fuel system/tank with the vessel now being propelled by two electrically powered Schottel STP Twin thrusters, each rated at 1,150 kW at 1,480 rpm.

While the prime movers are two 6-cylinder Wärtsilä 20DF dual-fuel generating sets, for navigating within harbors, the vessel uses two Mitsubishi auxiliary generators.

Switching to LNG fuel means providing against various unlikely malfunctions, such as an ignition failure resulting in an unburned mixture of gas and air in the exhaust. This could cause uncontrolled combustion and an increase in pressure the next time ignition takes place, putting a substantial strain on the pipe components.

To protect against this, the Mitsubishi auxiliary generators are protected by a Q-Rohr flameless venting system by German manufacturer Rembe GmbH that ensures that the reaction is vented directly at the exhaust.

Both the flame and the pressure are absorbed by the stainless steel mesh filter of the Q-Rohr, providing optimum protection for the pipe components and the environment.

 

  • News

Atlantic Coast: A time of renewal

If you were at a seaport along the U.S. Eastern Seaboard, more than likely you would be able to spot the distinctive blue “V” logo of the Vane Brothers Company on at least one tug in the harbor. The privately held marine transportation company has been serving the U.S. East Coast for more than 100 years, now handling chemical and petroleum products on its double-skin tank barges in seven ports from New York to Jacksonville, FL.

Under the steady guidance of C. Duff Hughes, the third generation of the Hughes family at the helm of the company, Vane Brothers, headquartered in Baltimore, MD, has been aggressively growing its fleet of 120 tugs and barges. Since 2008, Vane Brothers has been adding a series of 3,000-hp, Sassafras Class Articulated Tug Barge (ATB) tugs. Just last month, Vane Bros. ordered the 15th, 16th, and 17th of the class, all of which have been ordered from and built by Chesapeake Shipbuilding in Salisbury on the Eastern Shore of Maryland.

VaneFort SchuylerThe latest in the series delivered by Chesapeake Shipbuilding is the Fort Schuyler, the eleventh in the class. Its sister tug, the Kings Point, was delivered in April this year.

The tugs have been very popular with the company’s crews. Vane Brothers Senior Port Captain Jim Demske, says, “The crews on these tugs particularly like the high quality of the tugs’ construction and layout. The ergonomic arrangement of the pilothouses and engine rooms contribute comfort and safety. The power from the Caterpillar engines and the performance from the Twin Disc reduction gears all contribute to the great handling of these tugs, which is especially appealing to the operators. The new Simrad Solid State Halo radars and touch-screen electronics are some of the finest in the industry and also make life on these tugs better.”

Measuring 94 feet long and 32 feet wide with a hull depth of 13 feet, the Fort Schuyler is similar in most respects to the previous 10 tugs built for Vane by the shipyard.

The vessel is equipped with twin Caterpillar 3512 Tier 3 main engines producing a combined 3,000 horsepower, and operates with a single-drum hydraulic towing winch from JonRie Intertech, Manahawkin, NJ.

“Soft-core” panels and heavy, fire-rated doors are used throughout the boats, offering the crew a safer and quieter living environment.

“Vane Brothers and Chesapeake Shipbuilding continue to have a very strong relationship,” says Demske. “The next tug to be launched in coming weeks will be the Fort McHenry, followed by the Fishing Creek.” Demske says the names of the other tugs have yet to be announced.

The Fort Schuyler, like the Kings Point, has joined Vane Brothers’ fleet based in New York. The two vessels are named for the campuses of SUNY Maritime College in Fort Schuyler, NY, and the U.S. Merchant Marine Academy in Kings Point, NY.

In addition to the 3,000-hp tugs coming from Chesapeake Shipbuilding, there are two 4,200-hp tugs under construction at St. Johns Ship Building in Palatka, FL, for delivery in 2016, with two more under contract.

VANE ADDS NEW BARGES, TOO
According to Vane Brothers, three 35,000-barrel barges and four 55,000-barrel barges (including the 509A asphalt barge) have been delivered in the last 10 months, with another 55,000-barrel barge expected before the end of the year. These have come primarily from Conrad Shipyards in Orange, TX, and Amelia, LA, as well as Jeffboat in Jeffersonville, IN.

New and current mariners at Vane have a variety of training opportunities available to them, both formal and informal. According to Vane Brothers spokesman Blaise Willig, the company has supported many vessel-based employees this year as they receive instruction to help them be more effective at their current jobs and contribute to their future advancement. Vane is a Partner Company in the Workboat Academy’s Workboat Program. And, as a result of Person in Charge (PIC) Barge training this year at the Maritime Institute of Technology and Graduate Studies (MITAGS) in Linthicum Heights, MD, former Vane Deckhands have become highly qualified Tankermen now assigned to Vane barges. Vane’s training efforts and commitment to promoting from within help to ensure that its vessels are manned with professionals who meet and surpass the highest standards in the industry.

NEW ATB TUG LAUNCHED FOR BOUCHARD

Early last month, the Moss Point Marine shipyard of VT Halter Marine, Inc., launched the M/V Morton S. Bouchard a 6,000hp, twin-screw Articulated Tug Barge (ATB) tug for Bouchard Transportation, Inc., Melville, NY.

The ATB tug is one of two sister vessels being built under a two-vessel contract signed in August 2014. Morton S. Bouchard and sister vessel Frederick E. Bouchard each measure 130 feet by 38 feet by 22 feet and is classed by ABS as +A1 Ocean Towing, Dual Mode ATB, USCG Subchapter C. On completion, both tugs will be equipped with an Intercon Coupler System. Deliveries are expected in January and May 2016, respectively. The vessels will enter into Bouchard Transportation’s fleet service in New York, NY.

This most recent launch follows the September launch from the Moss Point shipyard of another ATB tug for Bouchard, the 10,000 hp M/V Donna J. Bouchard.

Also equipped with an Intercon Coupler, Donna J. Bouchard, is classed by ABS as +A1 Towing Vessel, Dual Mode ATB, USCG Subchapter M. She will be paired with barge B.No.272, which is currently under construction at VT Halter Marine’s Pascagoula, MS, shipyard to comprise the second ATB unit built for Bouchard Transportation as part of its major expansion program.

“Bouchard Transportation Co. Inc. is happy to announce yet another successful launching of a state of the art ATB tug built by VT Halter Marine. The launching of the M/V Morton S. Bouchard Jr. is a special event within the Bouchard Family, for the vessel is named after the father of President/CEO, Morton S. Bouchard III, who wanted his father’s name to always remain on the waterfront for which he dedicated his entire fife to. The original tug, Morton S. Bouchard Jr., which was also built by Halter, was earlier renamed as The Bouchard Boys and continues to operate with Bouchard Fleet,” says Morton S. Bouchard III President and CEO, Bouchard Transportation.

“The successful launching of both vessels, the M/V Morton S. Bouchard Jr. today and the M/V Donna J. Bouchard in September is an indication of the commitment to the continued relationship with Bouchard Transportation,” says Jack Prendergast, CEO, VT Halter Marine.

MoranNEW ATB TUG FOR MORAN
Moran Towing has newbuild programs underway at Washburn & Doughty shipyard in East Boothbay, ME, and Fincantieri’s Bay Shipbuilding in Stugeon Bay, WI. Its newest ATB tug, Leigh Ann Moran, recently completed her sea trials in Sturgeon Bay. The 121 ft x 36 ft tug was christened in late September by her namesake, Leigh Ann Engibous, wife of long-time Chevron employee Bill Engibous.

Also under contract at Bay Shipbuilding are the 121 ft x 36 ft ATB tug Barbara Carol Ann Moran and a 110,000 bbl double-skin tank barge, which are due for delivery in the second quarter of next year.

Meanwhile, Washburn & Doughty have contracts for six 6,000 hp Z-drive harbor tugs for the New Canaan, CT-based tug company.

MCALLISTER PUBLISHES 150th ANNIVERSARY BOOK
Last year, McAllister Towing & Transportation Co., New York, NY, celebrated its 150th anniversary of providing marine transportation, towing and harbor services. The beautifully bound hard cover book recounts the history of the five generations of the McAllister family and the tugboat business. The company was founded by James McAllister, who arrived in New York City following a shipwreck and soon bought his first sail lighter in 1864. From those humble beginnings, the distinctive red and white striped funnels of McAllister tugs can be seen from Portland, ME, to San Juan, PR.

McAllister currently has one ABS-classed 5,000-hp Z-drive reverse tractor tug on order at Eastern Shipbuilding Group, Panama City, FL. The word on the street is that the company is in serious discussions with another shipyard regarding the construction of at least two other harbor tugs.

Eastern Shipbuilding also recently launched the H. Douglas M, the first in a series of four 5,150 hp escort tugs for Bay-Houston Towing. The 80 ft x 38 ft tug is based on a Z-Tech 2400 Class design by Robert Allan Ltd. Delivery of the escort tug is scheduled for early 2016.

The same design is being built by Eastern Shipbuilding for a series of four tugs for Suderman & Young. G&H Towing is the owners’ onsite representative and agent during the engineering, construction, and delivery for both Bay-Houston and Suderman & Young Towing.

WIND FARM VESSEL TAKES SHAPE
In Warren, RI, the first U.S.-flag wind farm vessel is taking shape at Blount Boats, Inc. Blount Boats President Marcia Blount says the 21-meter aluminum catamaran will be ready for delivery in April 2016.

Rhode Island Fast Ferry will operate the boat for Block Island Wind Farm in Rhode Island. The five turbine wind farm, the first commercial wind farm in the U.S., is expected to be up and running by the fourth quarter of next year.

The catamaran is a Crew Transfer Vessel (CTV) based on a design licensed from South Boats (IOW), Isle of Wight, the U.K., one of the leading designers and manufacturers of wind farm vessels in Europe. South Boats IOW has designed and built some 85 CTV’s for the European offshore wind sector.

Blount Boats is eyeing the progress of offshore wind energy closely, says Marcia Blount.

Blount Boats also is building a passenger vessel for Chicago’s Shoreline Sightseeing. Shoreline Sightseeing provides guided architecture tours on the Chicago River, as well as classic tours on Lake Michigan and “Brew Cruises” and wine-tasting cruises.

NEW BOATS FOR CIRCLE LINE
About a 20-minute ride from Warren, RI, is the shipyard of Gladding-Hearn Shipbuilding, a Duclos Corporation in Somerset, MA. Known for their construction of aluminum, multi-hull vessels based on IncatCrowther designs, the Massachusetts shipbuilder is actually building three all-steel 600-passenger vessels for Circle Line Sightseeing Yachts, Inc., New York, NY. The 165 ft x 34 ft were designed by DeJong & Lebet, Jacksonville, FL. Those boats are due for delivery in the spring.

It’s also building a 493-passenger ferry for Hy-Line Cruises due for delivery in 2016.

One of the latest deliveries from Gladding-Hearn is the Manatee, a 28-knot Chesapeake Class launch and the first in a new generation of the popular, mid-size pilot boats for the Tampa Bay Pilots Association.

The boat continues a successful partnership between Gladding-Hearn and C. Raymond Hunt Associates, Inc., New Bedford, MA.

The Somerset, MA, shipyard introduced the Chesapeake Class pilot boat in 2003. Since then, 15 have been delivered to pilot associations throughout the U.S.

The latest improvements incorporate the performance benefits of Volvo Penta’s IPS2 inboard propulsion system.

“The IPS2 system was created to improve the performance and the arrangement of planning hulls like our pilot boats,” says Peter Duclos, the shipyard’s president. “This new generation of Chesapeake launches, named Chesapeake Class MKII, is equipped with the IPS2 pods, which provide what pilots have been asking for: higher speeds, lower fuel consumption, and more comfort.”

With a deep-V hull designed by C. Raymond Hunt & Associates, the all-aluminum pilot boat measures 52.7 ft overall, with a 16.8-ft beam and a 4.5-ft draft.

It is powered by two Volvo Penta D11, six cylinder, EPA Tier 3 diesel engines, each producing 503 bhp at 2,250 rev/min. Each engine is connected to a Volvo Penta IPS propulsion pod, which is fitted with dual forward-facing, counter-rotating propellers and integrated exhaust system, and Volvo Penta’s integrated EPS electronic steering and control system.

The EPS control system and three-axis joystick increases the boat’s overall maneuverability alongside a ship and when docking, says Duclos.

The financial incentive for the Tampa Bay pilots to optimize fuel economy, vessel handling and comfort led the shipyard to install a Humphree Interceptor automatic trim- optimization system.

“The combination of the Volvo Penta IPS system and the Humphree interceptors gives the pilots higher speeds and improved comfort, while burning 25 percent less fuel than similar Chesapeake Class launches,” says Duclos.

Key design changes to the Chesapeake Class MKII include positioning the wheelhouse aft of amidships to improve comfort and provide for a larger foredeck.

With the pods close-coupled to the engines, the engine room is located well aft of the wheelhouse with easy access to machinery through a deck hatch.

This new generation of pilot boats is also designed to accept a gyro-stabilization system, designed to reduce vessel roll.

MIX OF REPAIR AT DETYENS
This past year, there has been a good mix of commercial and government repair at Detyens Shipyards, Inc., Charleston, SC, according to the company’s Bradley Kerr. “We have recently completed work on two German owned-container vessels, a pair of casino vessels and have the usual tugs and barge units, dredge vessel and other similar harbor barges are rolling through.  We also have recently won MSC contracts on the Button and Spearhead as well as the Atlantis from Woods Hole.”

The largest commercial ship repair yard on the U.S. East Coast, Detyens also recently finished repairs on the USCG Elm and will begin work on the NOAA vessel Gordon Gunter soon. The Dredge Wheeler is also in the shipyard.

This past spring and summer, Detyens dry docked the ferries 28,460 gt M/V Highlanders and 18,523 gt M/V Leif Ericson for Marine Atlantic, Inc., St John’s, Newfoundland, Canada.

FERRY REPOWER AT CADDELL
Over the next five years, the Delaware River and Bay Authority, owner and operator of the Cape May-Lewes Ferry, plans to repower its entire fleet with cleaner burning, more fuel efficient Tier 3-compliant diesel engines.

The first of those ferries, the Delaware, arrived at Caddell Dry Dock on Staten Island, NY, on November 2 to begin the four- to five-month repower project in conjunction with its regulatory required five-year drydocking.

According to James Gillespie, Chief Port Engineer for the Cape May Lewes ferry, the Delaware is expected to return to service in April of 2016. The dry-docking is expected to cost $3.5 million.

“We’re excited to begin our vessel repowering program,” says Heath Gehrke, Director of Operations for the Cape May-Lewes Ferry. “These new engines not only burn less fuel and are more efficient, but emissions are reduced by nearly 40 percent. By undertaking this effort, we can significantly extend the useful life of our fleet and provide a cleaner environment in the communities we serve.”

Gehrke also notes that the ferry expects to save about $130,000 per year in maintenance costs associated with old engines and that the new clean diesel engines have the capability to be converted to operate on natural gas in the future.

The existing Fairbanks Morse engines are overhauled and rebuilt every 10,000 hours of usage compared to every 30,000 hours for the new EMD (Electro-Motive Division) engines. The engines were purchased from Marine Systems Inc. at a cost of $1.8 million.

While at the shipyard, the vessel will have other modifications and improvements completed, including the installation of a new gray water recovery system, new stainless steel railings and new propeller shaft seal system; installation of a new keel cooler system for main engine and generator cooling; and the bow thruster system will be overhauled.

To further assist the University of Delaware’s water research efforts on the Delaware Bay, the SeaKeeper seawater monitoring system, which collects water quality data while a vessel transits the Delaware Bay, will be installed on the MV Delaware.

During a ceremony held at the Lewes Ferry terminal in December 2014, U.S. EPA Regional Administrator Shawn M. Garvin announced the award of a Diesel Emission Reduction Act (DERA) grant of $970,000 to help facilitate the project. The Delaware River and Bay Authority (DRBA) sought the grant funding through the National Clean Diesel Assistance Program, which focuses on reducing emissions at ports under the Diesel Emission Reduction Act (DERA).

The M/V Delaware is currently equipped with two Fairbanks Morse 38D8-1/8 propulsion engines with a power rating of 2,060 horsepower each. More than 40 years old, these workhorse engines are approaching 100,000 operating hours or the equivalent of 1.5 million miles. In addition, because the engines are no longer built, spare parts are both difficult to find and expensive.

Within the next five years, the Authority plans to repower the other vessels in the Cape May – Lewes Ferry fleet: the MV New Jersey and MV Cape Henlopen.

  • News

ClassNK moves to spur marine industry use of Big Data

Rapid advances in the development of information and communication technologies now make it possible to collect large volumes of data on a diverse range of items related to ship operations. However, the approach to data capture is still very fragmented with similar data being sent to several vendors and analysis still being carried out almost entirely on a ship-by-ship basis.

To make larger gains, an effective platform capable of centralizing and managing such diverse data is essential. However, creating and maintaining this kind of platform is costly, time-consuming and unrealistic for many organizations.

Special care also needs to be given to the handling of data to ensure confidentiality of information; hence it is also necessary to establish a secure yet effective platform from an impartial perspective.

As an independent, non-profit organization with over a century of experience in ship classification, ClassNK has drawn on its extensive technical knowledge and expertise to develop Ship Data Center Co., Ltd.

The Data Center consists of a secured shipping operations database which will serve as an information hub to independently manage the utilization of big data in the maritime industry. Through the center’s integrated data, the industry can maximize the benefits of big data with a minimum cost and burden.Trials of the Data Center will commence on a container vessel in February 2016 in cooperation with a Japanese shipping company. Various information including data from the ship’s voyage data recorder and data logger will be gathered from the vessel.

Full operation of the Data Center is scheduled from April 2016.

ClassNK sees opportunities for future application of the Data Center as “infinite.”In addition to optimizing ship operations and improving condition-based monitoring of machinery, the Data Center could also be used to help the industry overcome current and emerging challenges.

For example, the entry into force of the Monitoring, Reporting and Verification (MRV) regulation by the EU requires shipowners and operators to annually monitor, report and verify fuel consumption for vessels 5,000 gt or over which call at any EU port. Data collection will be required from January 1, 2018. The Data Center plans to offer shipowners and operators a secure and neutral database in which to store and manage these vast amounts of fuel consumption data.

ClassNK says that establishment of Ship Data Center Co., Ltd. reinforces its position as part of indispensable infrastructure of the industry and demonstrates its commitment to creating a safer, greener and more efficient global maritime industry.

  • News

Concept LNG fueled mega box ship would be COGAS electric

The partners in the study — LNG containment system specialist GTT, containership operator CMA CGM (and its subsidiary CMA Ships) and classification society DNV GL — say the concept that has the potential to offer a more efficient, more flexible and greener box ship design than current 20,000 TEU two-stroke diesel engine driven ultra large container vessels.

They have dubbed the vessel the “Piston Engine Room Free Efficient Containership” (PERFECt).

Essentially, the concept ship takes advantage of the flexibility of electric drive to use space previously occupied by the main to carry cargo, more than offsetting the extra volume required by the LNG fuel tanks in comparison with conventional HFO tanks.

A comprehensive analysis with the DNV GL COSSMOS tool simulated components of the power production and propulsion system to analyze the COGAS system, making it possible to get detailed data for the calculation of the overall fuel efficiency for a complete round voyage.

Using a global FEM analysis, the project partners also evaluated the impact of the changes that were made to the general arrangement.

The two 10,960 cu.m LNG fuel tanks are located below the deck house, giving the vessel enough fuel capacity for an Asia/Europe round trip.

With the gas and steam turbines integrated at deck level within the same deck house as the tanks, space normally occupied by the conventional engine room can be used to increase cargo capacity significantly.

The dissociation of electric power generation from electric propulsion allows the electric power plant to be moved away from the main propulsion system, giving a great deal of flexibility. In fact, say the partners “an engine room is not needed any more.”

The three electric main motors, which are arranged on one common shaft, can be run fully independently of each other providing increased redundancy and reliability and a high level of safety.

With gas turbine-driven power production utilizing a very clean fuel as well as electric propulsion, the ship’s machinery systems will be simplified and more robust. This approach is also expected to lead to new maintenance strategies, already common practice in aviation, that would enable shipping companies to reduce the ship’s engine crew and save costs.

The study also suggests that optimizing the power plant through minimizing the steam turbine size, reducing power capacities, condenser cooling, and using a two-stage pressure steam turbine and steam generator will increase the system’s efficiency further. The next phase of the study aims to optimize the propulsion system and ship design to attain even greater efficiency and increased cargo capacity.

THE PRICE TAG

As part of the analysis, costs for additional and reduced systems to the base case ship (CMA CGM’s 20,000 TEU Marco Polo) were considered.Additional costs included:
ƒƒ

  • membrane tanks,
  • gas and steam turbines,
  • fuel gas handling, and
  • structural reinforcements (needed as there is no aft engine casing).

Costs that could be eliminated or reduced in compared to the two-stroke engine system included:ƒƒ

  • scrubber, which is eliminated,
  • cooling system capacity, which is reduced and the system simplified, and
  • ƒƒHFO treatment or tank heating, which is not needed.

At the end, the CAPEX (capital expenditure) for the COGAS ship are seen as being to be 20% to 24% above those for a conventionally-fueled vessel.

The OPEX (operating expenditure) costs largely depend on the difference in fuel price, the additional income related to the additional containers which can be transported and the savings related to a possibly higher system efficiency.

On the basis of the current gas price in Europe, which is nearly the same as the HFO price a business case in comparison with a two stroke ship using HFO plus scrubber as a reference therefore “needs compensation either by a larger difference between gas and LNG price or by additional benefits from efficiency improvement and additional revenue from additional container slots.”

Still, the partners say that the results of the feasibility study, including the CAPEX and OPEX calculations, encourage them to plan a more detailed evaluation of the overall system in a follow-up project.

MORE

Perfect GA

  • News

Allied Marine deck machinery for Navy research vessels

AUGUST 9, 2015—The R/V Neil Armstrong, scheduled for completion this year at Dakota Creek Industries, Anacortes, WA, is equipped with a modern array of oceanographic research equipment. Allied Marine Crane, a division

  • News

Good news, bad news for Fincantieri

JULY 2, 2015 — It’s been a bad news, good news week for Italian shipbuilding giant Fincantieri. On the down side, operations at its Monfalcone shipyard, remained closed for the third day

Svitzer orders two more Damen ASD tugs

JUNE 29, 2015 — Towage and emergency response specialist Svitzer has ordered two more Damen ASD 3212 tugs with 80 tonnes bollard pull performance. They are being built at Damen’s Song Cam