Search Results for: semi-submersible rig

Fred Olsen Energy terminates rig contract at HHI

Today, Fred. Olsen Energy said that its Bollsta Dolphin Pte. Limited subsidiary has notified HHI that it has exercised its contractual termination right under the newbuilding contract as a result of the delay in delivery of the rig, the Bollsta Dolphin, a Moss CS 60 E, sixth generation ultra deepwater semi-submersible.

Fred. Olsen Energy says that the rig construction contract provides that on termination Bollsta will be
entitled to a refund of the first instalment paid to HHI of $186,390,240 plusaccrued interest.

The rig had been under contract to Chevron North Sea Limited under a contract entered into in October 2012. That contract has now been “mutually terminated” on “amicable terms.”

Beacon Group orders ice class rig

JANUARY 17, 2014—Beacon Holdings Group has ordered a harsh environment ice class semi-submersible GM4-D rig from offshore rig builder Yantai CIMC Raffles that will be delivered in the fourth quarter of 2016. 

  • News

Brazil rig project involves major logistics moves

OCTOBER 25, 2013 — With Brazil’s offshore industry requiring ever bigger and more complex floaters, shipbuilders require increasingly complex logistics solutions to bring components together from different fabrication sites and then transport

  • News

Ocean Rig orders another drillship

SEPTEMBER 3, 2013 — Ocean Rig UDW Inc. (NASDAQ: ORIG) has signed a contract to construct a seventh generation ultra deepwater drillship at Samsung Heavy Industries. It will be a sister ship

Chinese shipyard to build Zentech jackup rig design

MAY 13, 2013—China State Shipbuilding Corporation’s Guangzhou Huangpu Shipbuilding is starting the construction of two jackup drilling rigs based on a new design from Zentech, Inc., Houston, TX. The new R-550D jack