![](https://www.marinelog.com/wp-content/uploads/2018/04/c130518824c199035cd7b578c011b5b0-300x225.jpg)
Navy oiler to be overhauled at Boston Ship Repair
MAY 15, 2018 — Boston Ship Repair LLC, Boston, MA, was recently awarded a $16,102,734 firm-fixed-price contract for a 63-calendar day shipyard availability for the regular overhaul dry docking of the Navy