Damen Dunkerque retrofits cable layer with BWTS
APRIL 17, 2015 — Global Marine Systems Limited’s 145.5 m cable layer Cable Innovator recently left Damen Shiprepair Dunkerque, France, after extensive work that included the installation of a ballast water treatment