Another $323.6 million for CVN 79
Written byThe Navy is awarding Northrop Grumman Shipbuilding, Newport News, Va., a $323,611,867 modification to previously awarded contract (N00024-09-C-2116) for continuation of construction preparation efforts for the second aircraft carrier (CVN 79) of the Gerald R. Ford class.
Work will provide all services and material in preparation for construction of CVN 79 including necessary research studies; engineering; design; related development efforts; advanced planning; advanced procurement for detailed design and procurement of long lead material; advance construction; life cycle support; logistics data, and other data to support the anticipated fiscal 2013 ship detail design and construction.
Work will be performed in Newport News, Va., and is expected to be completed by October 2012. Contract funds will not expire at the end of the current fiscal year. This contract was not competitively procured. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.
December 8, 2010
Leave a Reply
You must be logged in to post a comment.