Crowley breaks ground for eWolf charging station

Written by Nick Blenkey
Ground breaking for eWolf charging station

Representatives of Crowley and its partners picked up golden shovels in a ceremonial ground breaking for the eWolf shoreside charging center.

Crowley and the Port of San Diego have broken ground for the shoreside charging station that will provide clean energy for eWolf, Crowley’s zero-emissions all-electric tugboat. The eWolf charging station is a microgrid charging facility that will allow vessels to recharge quickly while reducing peak loads on the community energy grid. It is equipped with two containerized energy storage systems provided by Corvus Energy.

The station is designed to operate on off-peak hours from the community’s energy grid, and it includes a solar power array to support renewable energy use. The technology is also designed to support other electric equipment and vehicle operations, if needed.

Each energy container will house battery modules with storage capacity of almost 1.5 MWh, for a total capacity of 2,990 kW. The station will be equipped with battery monitoring system, HVAC and firefighting and detection technology.

eWolf charging station rendering
Equipped with two containerized energy storage systems provided by Corvus Energy, the eWolf charging station also includes a solar array

“We are proud to share in this moment with the City of San Diego to showcase an industry-first, shoreside charging station at the Port of San Diego,” said Matt Jackson, vice president of advanced energy for Crowley. “Building a sustainable, zero-emission port of the future requires pioneering new and innovative technology, as well as a commitment to partnerships so we can meet the needs of our communities, customers and people.”

“We are proud to work with Crowley and are grateful they chose San Diego Bay as home of the first all-electric tugboat in the United States,” said Rafael Castellanos, chairman of the Port of San Diego Board of Port Commissioners. “Their commitment to sustainability in the maritime industry directly aligns with our own efforts and goals to reduce emissions and improve public health in our communities while also supporting efficient and modern maritime operations.”

The eWolf and the eWolf charging station are the result of a partnership between Crowley, the San Diego County Air Pollution Control District, the California Air Resources Board, the Port of San Diego, the U.S. EPA and the U.S Maritime Administration.

The eWolf, currently under construction at the Master Boat Builders shipyard in Coden, Ala., is a key component of the shared commitment between Crowley and its federal and local partners to invest and develop emissions-free technology. It is designed to operate at its full performance capabilities while running entirely on electricity.

Categories: Coastal, News Tags: , , , , , , , , , , , , , ,