Marc Sima, FUELSAVE

Optimizing combustion to reduce black carbon emissions in the Arctic

Reducing black carbon emissions is one of the few avenues by which shipping can have an immediate and tangible impact on climate change in the Arctic. FUELSAVE’s CEO and co-founder Marc Sima

Van Oord signs three year service agreement with ABB Turbocharging

ABB Turbocharging is to provide Dutch dredging company Van Oord with fleetwide maintenance and optimization services under a recently signed three-year agreement. The agreement comes as two Van Oord vessels receive the

Brunvoll to equip Van Oord cable layer

The next generation cable layer recently ordered by Van Oord will have a complete propulsion and maneuvering system supplied by Molde, Norway, based Brunvoll AS. As we reported earlier, (see story) the

Van Oord orders cable layer at Vard

Rotterdam-based Van Oord, a leading player in the market for laying and burying offshore wind power cables, has placed an order with Fincantieri Group member Vard for design and construction of a

Van Oord dredge trio will have Damen steering and rudder systems

Damen Marine Components (DMC) has won an order for three sets of steering and rudder systems for the three dual-fueled trailing suction hopper dredges (TSHDs) currently being built at Keppel Offshore &

Van Oord orders third dredge at Keppel FELS

Rotterdam headquartered Van Oord has exercised an option to build a third trailing suction hopper dredge at Singapore’s Keppel FELS shipyard. Like two dredges ordered from Keppel Offshore & Marine by Van

Van Oord to buy Vroon offshore wind installation subsidiary

JULY 16, 2018 — Rotterdam, Netherlands, headquartered dredging and offshore contracting specialist Van Oord is adding to its U.K. offshore wind related capabilities by signing an agreement to acquire Vroon Group’s MPI

Van Oord orders LNG fueled hopper dredge duo at Singmarine

MAY 16, 2018 — Rotterdam headquartered Van Oord has ordered two LNG dual fueled trailing suction hopper dredges with a hopper capacity of 10,500 cu.m each. They will be built at Keppel