Baleària's second giant LNG-fueled fast ferry , Margarita Salas, enters service

Baleària’s Margarita Salas LNG-fueled fast ferry enters service

Following sea trials and the vessel’s positioning voyage from shipbuilder Astilleros Armon, Spanish ferry operator Baleària this week put its second 1,200 passenger/425 vehicle, LNG dual-fueled fast ferry, the Margarita Salas, into

New James Fisher tanker

Wärtsilä power and propulsion package picked for new James Fisher tanker newbuilds

Wärtsilä reports that it is to supply a fully integrated, mechanical drive, propulsion package for new 6,000 dwt LNG-fueled tankers being built for U.K. operator, James Fisher Everard Ltd., part of the

ammonia-fueled gas carrier

Wärtsilä will supply systems for two more ammonia-fueled gas carriers

Ammonia doesn’t produce CO2, sulfur or particulate emissions when combusted, making it a prime candidate to be shipping’s new green fuel. There are currently no ammonia-fueled ships in operation, but Antwerp, Belgium,

La Méridionale ferry

Wärtsilä solutions will minimize emissions of new La Méridionale RoPax duo

Two new LNG-fueled RoPax ferries under construction at China Merchants Jinling Shipyard for CMA CGM subsidiary La Méridionale will feature an extensive range of Wärtsilä technology. The 180-meter long ferries will be

cable laying vessel

NXT’s new cable laying vessel will be methanol fueled

Danish-headquartered power cable designer, manufacturer and installer NKT has named its second cable laying vessel NKT Eleanora, meaning “shining light.” Under construction by Fincantieri Group member Vard to a design by Norway’s

One of the ferries covered by lifecycle agreements

Japanese ferry operator signs up for Wärtsilä lifecycle agreements

Wärtsilä reports that it has signed two lifecycle agreements covering two ferries owned by Japanese operator Shin Nihonkai Ferry Co., Ltd (SNF). The vessels are each powered by four Wärtsilä 31 engines.

Vardin fishing vessel

Vardin selects Wärtsilä 25 to power new freezer trawler

Mest Shipyard in the Faroe Islands has signed a contract to build a new freezer trawler for Faroese fishing company Vardin. It is expected to be the first of three built for

ferry covered by Wartsila lifecycle agreement

Wärtsilä inks lifecycle agreement for new P&O Ferries

The world’s largest double-ended ferries, U.K.-based P&O Ferries’ 230-meter long M/V Pioneer and M/V Liberté, will be covered by a five-year lifecycle agreement with Wärtsilä. The agreement is designed to optimize the

CHAMP barge alongside ship

EBDG’s CHAMP barge will be Wärtsilä powered

In a move to cut vessel emissions in U.S. ports, Seattle, Wash., based naval architecture firm Elliott Bay Design Group (EBDG) has entered into a collaboration agreement with Wärtsilä that will see

Solvang's Clipper Eris will pilot the CCS retrofit

Seatrium and Solvang in world’s first full-scale CCS retrofit

Solvang ASA has selected Singapore’s Seatrium to carry out the world’s first first full-scale, turnkey carbon capture and storage retrofit on an oceangoing ship: the 21,289 cubic meter ethylene carrier Clipper Eris.

LOAD MORE