
Cruises return to the Port NOLA with 285 ship calls for 2022
Both ocean-going and inland river cruises are scheduled to make a comeback at the Port of New Orleans (Port NOLA) in 2022. The arrival of the Norwegian Breakaway on November 21 at
Both ocean-going and inland river cruises are scheduled to make a comeback at the Port of New Orleans (Port NOLA) in 2022. The arrival of the Norwegian Breakaway on November 21 at
The Coast Guard issued a Notice of Violation to the owner and master aboard a 48-foot commercial fishing vessel for negligence while operating in conditions of restricted visibility and a failure to
The St. Paul Engineer District locked the last tow to depart St. Paul, Minn., November 23—ending the 2021 navigation season on the Upper Mississippi River. Marquette Transportation‘s M/V Jonathan Erickson, pushing five
In an effort to improve the fluidity of the largest import gateway in the United States, the CMA CGM Group, is to implement an Early Container Pickup Incentive Program at the ports
Manson Construction Company, Seattle, Wash., has been awarded a $16,945,950 firm-fixed-price contract for maintenance dredging. Work will be performed in Saint Marys, Ga., with an estimated completion date of May 7, 2022.
Cowes Harbour Commission (CHC) is joining the charge for environmental responsibility among the UK’s ports and harbors as it today announces its adoption of the Carbon Management Plan developed by technical and
Coden, Ala.-based Master Boat Builders Inc. (MBB) and naval architect and marine engineering firm Robert Allan Ltd. (RAL) have developed new battery hybrid tugboat design, the ElectRA 3000-H. This design has been
Jeanerette, La.-headquartered Metal Shark has delivered a 55- by 17-foot welded aluminum pilot boat to the Pascagoula Bar Pilots Association in Mississippi. Called Singing River Island, the vessel is the second Metal
Federal Marine Terminals (FMT), a subsidiary of Canada’s Fednav Limited, recently announced a new river terminal on at Port Itawamba in Fulton, Miss. The operating agreement was signed back in March. The
The Vicksburg Engineer District welcomed the dredge Jadwin and crew home to the Vicksburg, Miss., Harbor on November 18, just in time for the holidays. The dredge and crew of around 50