
Kirby orders ATB
JANUARY 16, 2014 —Houston-headquartered Kirby Corporation (NYSE:KEX) has signed an agreement to construct an articulated 185,000 barrel tank barge and 10,000 horsepower tugboat unit at a cost of $75 million to $80
JANUARY 16, 2014 —Houston-headquartered Kirby Corporation (NYSE:KEX) has signed an agreement to construct an articulated 185,000 barrel tank barge and 10,000 horsepower tugboat unit at a cost of $75 million to $80
JANUARY 15, 2014 — Piracy at sea has reached its lowest levels in six years, with a 40% drop since Somali piracy peaked in 2011, according to the International Chamber of Commerce
JANUARY 15, 2014—Vard Holdings Limited reports that it has secured a contract with an international customer for the design and construction of a diving support and construction vessel (DSCV). The DSCV is
JANUARY 15, 2014 — The Maritime and Port Authority of Singapore (MPA) has cancelled the bunker supplier licenses of Excel Petroleum Enterprise Pte Ltd and Lian Hoe Leong & Brothers Pte Ltd
JANUARY 15, 2014 — General Dynamics Electric Boat Corp., Groton, Conn., is being awarded a $15,000,000 cost-plus-fixed-fee modification to previously awarded contract (N00024-13-C-4308) to provide non-nuclear submarine repair work on Groton-based submarines
JANUARY 15, 2014 — Nordic American Tankers (NAT) says that Nordic American Offshore (NAO) yesterday took delivery of the last of six recently built platform supply vessels (PSVs) from the Ulstein Group
JANUARY 15, 2014 — Oslo headquartered Yara International ASA (OSE: YAR) has acquired Germany’s H+H Umwelt-und-Industrietechnik GmbH, a leading producer of Selective Catalytic Reduction (SCR) systems for secondary NOx reduction in marine
JANUARY 14, 2014 — A 26-foot tugboat lost control of the barge it was towing off Atlantic Beach, Nassau County, N.Y., Monday evening and subsequently sank. U.S. Coast Guard and state officials
JANUARY 14, 2014 — Brittany Ferries and shipbuilder STX France SA have now signed a contract covering the construction of a 2,474 passenger LNG fueled ferry for delivery in fourth quarter 2016.
JANUARY 14, 2014 — The first Wärtsilä X72 mid-bore, low-speed engine has successfully passed factory acceptance tests, verifying that it fulfils design criteria for performance and functioning and has been accepted by