
Weeks Marine repowers crew boat with first Cummins X15 engines
JANUARY 14, 2019 — A Weeks Marine aluminum crewboat, the Joseph M, originally delivered in 1982, has been repowered with the first pair of the new Cummins X15 marine engines. The X15
JANUARY 14, 2019 — A Weeks Marine aluminum crewboat, the Joseph M, originally delivered in 1982, has been repowered with the first pair of the new Cummins X15 marine engines. The X15
JANUARY 18, 2018 – The American Maritime Partnership (AMP) says that recent deliveries of four state-of-the-art vessels, constructed in U.S. shipyards, reflect the U.S. dredging industry’s continued investment in building dredges with
JANUARY 9, 2018 — Eastern Shipbuilding Group, Inc. recently delivered the trailing suction hopper dredge M/V Magdalen to Weeks Marine, Inc. The 6,540 cu.m TSHD has been designed and engineered by Royal
JULY 14, 2017—After building eight new 150 ft x 40 ft x 12 ft sand scow barges to be built at a Gulf of Mexico shipyard, maritime construction company Weeks Marine, Inc.,
AUGUST 15, 2013—The U.S. Army Corps of Engineers, New York District, recently awarded a firm-fixed-price, no option, non-multi-year, award with a maximum value of $26.4 million to Weeks Marine, Inc., Covington, LA,