Wartsila to power first LNG fueled construction vessel

APRIL 18, 2017 — Wärtsilä is to supply the engines and other propulsion machinery for the Orion, the new 210 m offshore construction vessel being built at the Cosco shipyard in China

Natural gas operating fleet concept gets LR AiP

APRIL 13, 2016 — Wärtsilä and COSCO shipping Heavy Industry Co (CHI) have jointly developed a natural gas operating fleet concept that has now obtained a Lloyd’s Register’s (LR) Approval in Principle

Wison unveils versatile LNG distributor design

APRIL 11, 2017 — Shanghai, China, headquartered Wison Offshore & Marine has developed the Wison-LNG-Distributor (LNGD). With a capacity range of 5,000 cu.m to 20,000 cu.m, the vessel integrates the functions of

TMC to supply compressors for FSRU newbuild

APRIL 10, 2017 — Oslo, Norway, headquartered TMC Compressors (TMC) has been awarded a contract by Daewoo Shipbuilding & Marine Engineering (DMSE) to supply a marine compressed air system to a new-build

DSME and DNV GL unveil new LNG carrier design

APRIL 7, 2017 — Daewoo Shipbuilding and Marine Engineering (DSME), and classification society DNV GL used this week’s Gastech event in Tokyo to present the results of a joint development project (JDP)

GTT introduces an LPG cargo containment system

APRIL 5, 2017 — LNG containment leader GTT is turning its attention to LPG. Philippe Berterottière, Chairman and CEO of GTT says that, thanks to a new GTT containment system, the LPG

Wartsila solutions, maintenance picked for Hoegh LNG newbuilds

APRIL 4, 2017 — Two new 170,000 m3 LNG carrier vessels being built for Norway’s Höegh LNG at the Samsung Heavy Industries (SHI) and Hyundai Heavy Industries (HHI) shipyards in Korea will

Shell to supply fuel for first LNG powered Aframaxes

APRIL 3, 2017 — Shell Western LNG B.V. has signed an agreement with Russia’s Sovcomflot (SCF Group) to supply liquefied natural gas (LNG) to fuel the first Aframax crude oil tankers in

LNG bunkering is an idea whose time hasn’t come (yet)

MARCH 28, 2017—With the the IMO Global Sulfur Cap of 0.5% looming on the horizon in 2020, Jack Jordan, Editorial Lead, S&P Global Platts, writes about whether shipowners will embrace burning Liquefied

How to get LNG to shore without a jetty

MARCH 27, 2017 — Wärtsilä has partnered with marine design consultancy Houlder and hose supplier Trelleborg to develop a system for transferring LNG from the carrier vessel to shoreline terminals where no

LOAD MORE