Great Lakes Shipyard drydocks Miller Boat Line ferry

APRIL 22, 2015 — Great Lakes Shipyard, Cleveland, OH, was recently awarded a drydocking contract for Miller Boat Line’s ferry M/V Put-In-Bay. The vessel was hauled out using the shipyard’s 770-ton capacity

Shipbuilders stage annual fly-in on Washington

APRIL 22, 2015 — Though members of Congress may only just be recovering after this month’s barge in by AWO members, today they are going to welcome a fly-in organized by the

BAE’s Norfolk shipyard celebrates its 100th anniversary

APRIL 21, 2015 — BAE Systems commemorated the 100th anniversary of its Norfolk, VA, shipyard this past weekend with a special event for employees and their families. The company, known for many

NASSCO gets LCS work award worth potential $96.3 million

APRIL 21, 2015 — General Dynamics, National Steel and Shipbuilding Co., San Diego, California, is being awarded a $24,161,138 cost-plus-award-fee, cost-plus-incentive-fee, with firm-fixed-priced and cost-only components contract for littoral combat ships (LCS)

Avondale’s future won’t include Kinder Morgan JV

APRIL 21, 2015 — One faint glimmer of hope for the Avondale shipyard has now sputtered out. Huntington Ingalls Industries (NYSE:HII) says it has completed discussions with Kinder Morgan Inc. (NYSE:KMI) to

NASSCO launches world’s first LNG fueled containership

APRIL 20, 2015 — Shipbuilder GD NASSCO hosted a milestone event, Saturday, April 18. The launch and christening of the Isla Bella, the world’s first LNG-fueled containership, was also the 100th launch

Vigor’s Tacoma shipyard adds newbuilding to its offerings

APRIL 17, 2015 — Vigor Industrial’s Tacoma, WA, shipyard is now adding newbuilding to its capabilities. Fabrication teams at the yard have delivered three 60′ x 24′ x 15.5′ breasting barges to

Damen Dunkerque retrofits cable layer with BWTS

APRIL 17, 2015 — Global Marine Systems Limited’s 145.5 m cable layer Cable Innovator recently left Damen Shiprepair Dunkerque, France, after extensive work that included the installation of a ballast water treatment

Boston Ship Repair awarded $9.3 million MSC contract

APRIL 16, 2015 —Boston Ship Repair LLC, Boston, MA, is being awarded a $9,315,047 firm-fixed-price contract for 56-calendar day shipyard availability for the regular overhaul and drydocking of the USNS Kanawha (T-AO

NASSCO cuts steel for third ECO tanker

APRIL 6, 2015 — In a steel cutting ceremony at its San Diego shipyard last week, General Dynamics NASSCO signaled the start of construction of a third ECO tanker to be built

LOAD MORE