
Aker Philly reports profitable first quarter
MAY 7, 2015 — In its first quarter 2015 results, Aker Philadelphia Shipyard (OSE: AKPS) reported EBITDA of $6.9 million compared to $ 24.7 million in first quarter 2014 when adjusted EBITDA
MAY 7, 2015 — In its first quarter 2015 results, Aker Philadelphia Shipyard (OSE: AKPS) reported EBITDA of $6.9 million compared to $ 24.7 million in first quarter 2014 when adjusted EBITDA
MAY 6, 2015 — Technology Associates, Inc. (TAI), New Orleans, LA, reports that shipbuilder Thoma-Sea Marine Constructors, LLC recently launched a 6,300 dwt OSV from its Lockport, LA. shipyard built to TAI’s
MAY 5, 2015 — Vigor Industrial LLC, Portland, OR, is being awarded an $11,979,903 firm-fixed-price contract for the regular overhaul and drydocking of USNS Richard E. Byrd (T-AKE 4). The contract includes
MAY 4, 2015 — Huntington Ingalls Industries (NYSE:HII) is continuing the deactivation of the world’s first nuclear powered aircraft carrier, USS Enterprise (CVN 65) (see earlier story). The process took another significant
MAY 4, 2015 — Huntington Ingalls Industries’ (NYSE:HII) Ingalls Shipbuilding division christened the company’s 29th Arleigh Burke-class (DDG 51) Aegis guided missile destroyer, John Finn (DDG 113), May 2. DDG 113 is
APRIL 29, 2015 — Bollinger Shipyards was presented with two safety awards at this month’s Spring General Membership Meeting of the Shipbuilders Council of America (SCA). The company was awarded the 2014
APRIL 26, 2015 — Vigor Marine LLC, Portland, OR, is being awarded an $8,730,074 firm-fixed-price contract for a 55-calendar day regular overhaul and drydocking availability of the USNS Guadalupe (T-AO 200), a
APRIL 23, 2014 — General Dynamics, National Steel and Shipbuilding Co. (NASSCO), San Diego, CA, has been awarded a $31,773,194 modification to previously awarded cost-plus-incentive-fee contract (N00024-13-C-4404) for USS America (LHA 6)
APRIL 22, 2015 — Ship repairer Marine Hydraulics International Inc., Norfolk, VA, is being awarded a $9,848,963 modification to previously awarded contract (N00024-10-C-4405) for USS Cole (DDG-67) fiscal 2015 selected restricted availability.
APRIL 22, 2015 — Great Lakes Shipyard, Cleveland, OH, was recently awarded a drydocking contract for Miller Boat Line’s ferry M/V Put-In-Bay. The vessel was hauled out using the shipyard’s 770-ton capacity