Vigor Marine wins $14 million T-AKE 6 drydocking contract

FEBRUARY 6, 2016 —Vigor Marine LLC, Portland, OR, is being awarded a $13,993,129 firm-fixed-price contract for a 45-calendar day shipyard availability for the regular overhaul and drydocking of USNS Amelia Earhart (T-AKE

Chouest Gulfport venture Topship gets $11 million incentive

FEBRUARY 14, 2016 — The Mississippi House today passed a $275 million incentive bill that Speaker Philip Gunn tweeted was the “biggest job creation bill in MS history.” Most of the money

GD NASSCO awarded $12.6 million LCS 2 contract mod

FEBRUARY 2, 2016 — General Dynamics-National Steel and Shipbuilding Co., San Diego, CA, is being awarded a $12,668,280 modification to previously awarded cost-plus-award-fee/incentive-fee contract (N00024-15-C-4313) for USS Independence (LCS-2) fiscal 2016 dry-docking

VIDEO: Fincantieri Marinette Marine launches LCS 11

FEBRUARY 1, 2016 — The Fincantieri Marinette Marine (FMM) shipyard, Marinette, WI, hosted a christening and launch ceremony this past Saturday for the christening of the eleventh Littoral Combat Ship, the future

OSI to supply INBS for Canada’s Resolve Project oiler

JANUARY  29, 2016 — Burnaby, BC, headquartered OSI Maritime Systems (OSI) has signed an agreement with shipbuilder Chantier Davie Canada Inc. to provide an Integrated  Navigation and Bridge System (INBS) for the

Detyens awarded $11.4 million for T-AO 203 drydocking

JANUARY 28, 2016 – Detyens Shipyards, Charleston, SC, is being awarded an $11,455,931 firm-fixed-price contract for 71-calendar day shipyard availability for the regular overhaul and drydocking of USNS Laramie (T-AO 203).  

Philly Shipyard lays keel for first of four for Kinder Morgan

JANUARY 28, 2016 – Philly Shipyard, Inc. yesterday held a ceremonial keel laying for the first product tanker in a four vessel order for American Petroleum Tankers (APT), a Kinder Morgan, Inc.

BAE San Diego gets $25.5 million Navy contract mod

JANUARY 27, 2016 — BAE Systems San Diego Ship Repair, San Diego, CA, has been awarded a $25,589,923 modification to previously awarded cost-plus-award-fee/incentive-fee contract (N00024-10-C-4407) for USS Anchorage (LPD-23) fiscal 2016 selected

Jensen to design, production engineer Lindblad newbuilds

JANUARY 26, 2016 — Jensen Maritime, Crowley Maritime Corp.’s Seattle, WA, based naval architecture and marine engineering company, is to provide detailed design and production engineering services for the two, 100 passenger,

Eastern launches MPFSV for Harvey Gulf

JANUARY 19, 2016 — Eastern Shipbuilding Group, Inc., Panama City, FL, recently launched the M/V Harvey Stone (Hull 234) for Harvey Gulf International Marine, LLC of New Orleans, LA, in a ceremony

LOAD MORE