Detyens wins $11.6 million MSC contract

JULY 21, 2014 — Detyens Shipyards Inc., North Charleston, South Carolina, is being awarded an $11,631,622 firm-fixed-price contract for a 75-calendar day regular overhaul and dry-docking of USNS Arctic (T-AOE 8). The

Kirby orders ATBs at Bay Shipbuilding

JULY 18, 2014 — Bay Shipbuilding Company (BSC) of Sturgeon Bay, WI, a subsidiary of Fincantieri Marine Group (FMG), has been awarded a contract to build two 155,000-barrel capacity barges and two

Ingalls awarded $23.49 million LHA 8 affordability contract

JULY 17, 2014 — Ingalls Shipbuilding, Pascagoula, MS, is being awarded a $23,499,948 modification to previously awarded Navy contract (N00024-13-C-2402) for early industry involvement associated with the LHA(R) Program Flight 1 (LHA

BC Ferries to convert Spirit class duo to LNG

JULY 17, 2014 — BC Ferries two newbuilds at Poland’s Remontowa Shipbuilding will not be the only LNG fueled vessels in its fleet. BC Ferries is to conduct mid-life upgrade modifications on

Port Calcite relaunches fuel barge

JULY 14, 2014 —The Greenstone II, a U.S. Department of Interior fuel barge, was recently relaunched at Port Calcite, Rogers City, MI, on completion of drydocking, repair work, and inspections. The barge

HII to provide family healthcare centers

JULY 9, 2014 — Huntington Ingalls Industries (NYSE:HII) reports that it will offer on-site family healthcare centers exclusively designed for its Ingalls Shipbuilding and Newport News Shipbuilding division employees and their families.

Atlantic Towing picks PSV 5000 design

JULY 7, 2014 — Canada’s Atlantic Towing has selected Damen’s ice-strengthened PSV 5000 design for the four new platform supply vessels it will add to its fleet, after securing a long-term contract

Triyards delivers first BH450 liftboat

JUNE 30, 2014 — Singapore headquartered Triyards has delivered the first liftboat of its BH 450 design. The Group’s first lattice-leg liftboat, the BH 450 stands at more than 130 m (approximately

CNG fueled Reverse Stern Drive tug under development

JUNE 27, 2014 — The first ever Reverse Stern Drive (RSD) tug to be fueled by compressed natural gas (CNG) tug is being brought to the market by Damen Shipyards, engine manufacturer

Bollinger delivers FRC 10

JUNE 26, 2014 — Bollinger Shipyards, Inc. has delivered the Raymond Evans, the tenth Fast Response Cutter (FRC) to the United States Coast Guard. “We are extremely proud to announce the delivery

LOAD MORE