VIDEO: NNS completes 965 ton CVN 79 superlift

APRIL 23, 216 — Huntington Ingalls Industries (NYSE:HII) has released video showing its Newport News Shipbuilding division placing a 965-ton structure dry dock using the shipyard’s 1,050-t gantry crane, continuing the construction

Shipbuilders Council and OSHA announce Alliance

APRIL 4, 2016 —The Shipbuilders Council of America (SCA), the National Shipbuilding Research Program and the Occupational Safety and Health Administration (OSHA), a part of the Department of Labor (DOL), are collaborating

BC Ferries awards Spirit conversions to Remontowa

MARCH 24, 2015 — Poland’s Remontowa Ship Repair Yard S.A. of Gdansk has won a $140 million contract for the mid-life upgrades (MLUs) of BC Ferries two Spirit Class ferries. The upgrade

Huntington Ingalls gets contract for CVN 73 RCOH planning

FEBRUARY 29, 2016 — Huntington Ingalls Industries (NYSE:HII) reports that its Newport News Shipbuilding division has received a $185.2 million contract option from the U.S. Navy to assist with planning for the

Triyards reports encouraging first quarter

JANUARY 8, 2016 — Singapore listed Triyards Holdings Limited reports it increased both revenue and net operating profit after tax before other income in its FY 2016 first quarter, the three months

Mabus announces name of first TA-O (X)

JANUARY 7, 2016 —In a ship-naming ceremony held at the Cannon House Office Building in Washington, DC, yesterday, Secretary of the Navy (SECNAV) Ray Mabus announced Jan. 6 that the first ship

Omnibus bill includes $1 billion for extra destroyer

That other shoe has now dropped.

Maine’s U.S. Senators. Susan Collins, a senior member of the Defense Appropriations Committee, and Angus King, a member of the Senate Armed Services Committee, said today that the final omnibus spending bill includes $1 billion toward the construction of an additional DDG 51 destroyer that would “likely” be built at Bath Iron Works and would be in addition to those already included in the current multi-year procurement contract.

The following is the statement issued by the two senators — interestingly it contains no acknowledgement whatsoever that the funding was any kind of pre-arranged “done deal,” widely expected by defense industry insiders.

U.S. Senators Susan Collins, a senior member of the Defense Appropriations Committee, and Angus King, a member of the Senate Armed Services Committee, announced today that the final omnibus bill includes $1 billion toward the construction of an additional DDG-51 destroyer. This destroyer would likely be built at Bath Iron Works. This destroyer would be in addition to those already included in the current multi-year procurement contract. The omnibus bill will be considered by Congress later this week.

As a senior member of the Defense Appropriations Committee, Senator Collins requested the funding toward the additional DDG-51 to help meet combatant commander requirements for destroyers across the globe. Senator Collins successfully advocated for the inclusion of the $1 billion in funding in the Senate Defense Appropriations Bill. The House Defense Appropriations Bill, however, allocated no funding for this additional destroyer. Following weeks of negotiations between the House and Senate regarding the bill, the omnibus bill appropriates the full $1 billion in funding toward this additional ship, affirming the strategic importance of our Navy and shipbuilding programs.

“Our destroyers are the workhorses of the Navy, and I am proud of the highly skilled, hardworking men and women at Bath Iron Works who continue to deliver the highest quality ships for our nation’s sailors,” said Senator Collins. “The power of presence cannot be taken for granted or ignored, which is why the investments for this new destroyer funded by this bill are so necessary. In a time of serious budget constraints for our Defense Department, this important investment underscores the value and importance of our naval assets to the security and stability of our country. The equation is simple: fewer ships means less presence, less security at home, and less security around the world. I am so pleased that after many long hours of negotiations, this $1 billion in funding was included in the final omnibus bill.”

“Senator Collins is a relentless advocate for the hardworking men and women at Bath Iron Works, and I am thankful that she was able to secure additional funding for shipbuilding through her position on the Appropriations Committee,” said Senator King. “The funding for this additional ship is a major achievement for Maine and she deserves all the credit. There is no one I’d rather be working with on behalf of BIW, the State of Maine, and the men and women of our armed forces than Susan.”

Senators Collins and King work together in support of Bath Iron Works from their respective positions on the Appropriations and Armed Services Committees. As a member of Armed Services, Senator King works to ensure that critical shipbuilding funding is authorized through the National Defense Authorization Act, a yearly bill that authorizes funding and directs policy for the Department of Defense. And as a senior member of Appropriations, Senator Collins works to make sure the authorized funds are then actually appropriated to shipbuilding priorities. Through this joint effort, the Senators are able to prioritize shipbuilding throughout the funding process.

As of January 2015, the Navy had 279 ships, well short of the goal set by the Navy’s 30-year shipbuilding plan which calls for the United States to have 304 ships by 2020. This investment will help to grow the Navy’s shipbuilding capabilities at a time when the Navy fleet is in high demand to protect national security interests worldwide.

Ingalls Shipbuilding launches DDG 114

 

The ship was translated from the land level facility to the drydock which was slowly flooded until the ship was afloat.

“This is an exciting milestone and represents a significant amount of effort by our Navy and industry team to get the ship to this point” said Capt. Mark Vandroff, DDG 51 class program manager, Program Executive Office (PEO) Ships. “We’re looking forward to completing outfitting efforts, undergoing test and trials and delivering another highly-capable asset to our Fleet.”

“The last week of translating this quality ship across land and then launching it from our drydock is no small task, and our shipbuilders accomplished it in a very efficient manner,” said George Nungesser, Ingalls’ DDG 51 program manager. “All crafts and personnel making up this DDG shipbuilding crew have performed very well, and we were able to launch DDG 114 ahead of schedule. It’s a nice milestone to accomplish as we end the year.”

Ingalls has built and delivered 28 Arleigh Burke-class destroyers. There are currently four more under construction at Ingalls, including Ralph Johnson, which is scheduled to be christened in the spring of 2016.

John Finn (DDG 113) was christened in May and is expected to undergo sea trials in 2016. Paul Ignatius (DDG 117) celebrated her keel-authentication milestone in October and is expected to launch in the first half of 2017. Delbert D. Black (DDG 119) started construction in July and is scheduled for keel laying in the second quarter of 2016.

DDG 114 is named to honor Pfc. Ralph Henry Johnson, who was awarded the Medal of Honor for his heroic actions that saved others during the Vietnam War. Johnson shouted a warning to his fellow Marines and hurled himself on an explosive device, saving the life of one Marine and preventing the enemy from penetrating his sector of the patrol’s perimeter. Johnson died instantly. The Charleston, S.C., native had only been in Vietnam for two months and a few days when he was killed at the age of 20.

The highly capable Arleigh Burke-class destroyers are capable of simultaneously fighting air, surface and subsurface battles.

,/p>

Navy awards Ingalls $200 million LPD 28 contract

.

 

According to defense media, BIW will get the additional destroyer under a “hull swap” agreement in a 2002 MOU between the Navy and its two largest shipbuilders that, among other things, reportedly included an agreement that, should a twelfth LPD be ordered,a fourth DDG 51-class ship or equivalent workload would be awarded to BIW.

Apparently, that’s likely to happen and that destroyer will be DDG 127, once Congress comes through with the funding.

However all that works out, the funds awarded Huntington Ingalls under the contract announced today will be used to purchase long-lead-time material and major equipment, including main engines, diesel generators, deck equipment, shafting, propellers, valves and other long-lead systems.

“This funding demonstrates the priority the Navy places on Ingalls getting started on this important ship,” said Ingalls Shipbuilding President Brian Cuccias. “Our shipbuilders have made great strides in the LPD program, and we are performing well. Building LPD 28 is key to maintaining a reliable supplier base and leverages our hot production line, enabling our team of shipbuilders to build this ship and future amphibious warships as efficiently and as affordably as possible.”

Ingalls’ 10th San Antonio-class LPD, John P. Murtha (LPD 26), was the most complete and lowest-cost LPD when launched, with many key systems finished months ahead of the shipyard’s historic best in the program.

Though LPD 28 will be substantially similar to its predecessors, it won’t have quite the same appearance. Gone will be the towering enclosed masts that had been built at HII’s now-closed Gulfport, MS Composites Center of Excellence facility, in their place will be open masts similar to those on the DDG 51 destroyers.

The 684-foot-long, 105-foot-wide LPD 17 class ships are used to embark and land Marines, their equipment and supplies ashore via air cushion or conventional landing craft and amphibious assault vehicles, augmented by helicopters or vertical takeoff and landing aircraft such as the MV-22 Osprey. The ships support a Marine Air Ground Task Force across the spectrum of operations, conducting amphibious and expeditionary missions of sea control and power projection to humanitarian assistance and disaster relief missions throughout the first half of the 21st century.

Ingalls Shipbuilding christens NSC 6

NOVEMBER 15, 2015 — Huntington Ingalls Industries’ (NYSE:HII) Ingalls Shipbuilding division christened the company’s sixth U.S. Coast Guard National Security Cutter (NSC), Munro (WMSL 755), November 14 in front of nearly 600

LOAD MORE