Star Cruises cuts first steel for Genting World
FEBRUARY 11, 2015 — Star Cruises officially launched the start of construction of Genting World, the first of two next generation cruise ships, in a steel cutting ceremony that saw Tan Sri
FEBRUARY 11, 2015 — Star Cruises officially launched the start of construction of Genting World, the first of two next generation cruise ships, in a steel cutting ceremony that saw Tan Sri
FEBRUARY 11, 2015 — Construction of the first four of nine Voith Water Tractor (VWT) tugs has started at Mexico’s Astimar 20 shipyard with a keel laying ceremony that was attended by
FEBRUARY 10, 2015 — The Lockheed Martin-led industry team officially laid the keel for the U.S. Navy’s thirteenth Littoral Combat Ship (LCS), the future USS Wichita, in a ceremony held yesterday at
FEBRUARY 9, 2015 — The Navy has awarded shipbuilders Huntington Ingalls Inc., Pascagoula, MS, and Bath Iron Works, Bath, ME, modifications to previously awarded contracts for DDG 51 Class Flight III upgrade
FEBRUARY 6, 2015 — The two biofuel-capable 4,700 dwt VG EcoCoaster general cargo ships ordered last month from Dutch shipbuilder Royal Bodewes by Finnish operator Meriaura Group are expected to have fuel
FEBRUARY 5, 2015 — The 2,200 m3 compressed natural gas (CNG) carrier ordered from Chinese shipbuilder Jiangsu Hantong Ship Heavy Industry Ltd. last year will be powered by an integrated Wärtsilä propulsion system.
FEBRUARY 4, 2015 — Technip has awarded Damen Shiprepair Rotterdam a contract for for drydocking, upgrades and operational modifications to the deepwater rigid pipe S-lay and heavy lift vessel Global 1200. The
FEBRUARY 3, 2015 — Royal Caribbean International today marked the official start of construction of a fourth Oasis class cruise ship with a steel cutting ceremony at shipbuilder STX France’s St. Nazaire
FEBRUARY 3, 2015 — BC Ferries has now awarded a long-term contract to energy utility FortisBC to supply liquefied natural gas (LNG) to fuel the three new intermediate class ferries that it
FEBRUARY 2, 2015 — Spanish shipbuilder Astilleros Gondan has been awarded the newbuilding contract for the three LNG fueled escort tugs that Norway’s Østensjø Rederi is building for operation at Statoil’s Melkøya