
Sister shipyards fix WSF ferry damaged in “hard landing”
When the 328 foot long Washington State Ferry M/V Cathlamet struck one of the mooring dolphins at the Fauntleroy Ferry Terminal near Seattle, on July 28, 2022, two sister shipyards — Everett
When the 328 foot long Washington State Ferry M/V Cathlamet struck one of the mooring dolphins at the Fauntleroy Ferry Terminal near Seattle, on July 28, 2022, two sister shipyards — Everett
Naval Facilities Engineering Systems Command (NAVFAC) Pacific has awarded a $2.8-billion task order under a previously-awarded contract to Dragados/Hawaiian Dredging/Orion JV, based in Honolulu, Hawaii, to replace Dry Dock 3 at Pearl
BAE Systems Ship Repair recently recognized its best suppliers and subcontractors during a “Partner2Win” supplier ceremony. More than fifty companies that successfully supported the company’s maintenance of U.S. Navy ships and commercial
At a time when many companies are cutting back on expenses in preparation for a coming recession, Jacksonville, Fla., based Fincantieri Marine Repair is doubling down on its support of U.S. military
Vigor Marine LLC, Portland, Oregon, has been awarded a $7,897,103 firm-fixed-price modification to a previously-awarded Navy contract for out of scope repair and replacement of structural decking in support of the Arleigh
Vigor has successfully completed a three-year modernization project on USS Chosin (CG 65) at its Harbor Island, Seattle, shipyard, sending the Ticonderoga-class guided-missile cruiser back to its homeport of Naval Station Everett.
Three major ship repairers — Vigor, MHI, and Continental Maritime — are to come under new ownership. Collectively, the three make up Titan Acquisition Holdings and, today, funds managed by its owners,
Palatka, Fla., based St. Johns Ship Building has appointed Ken Gentle to the position of vice president of repair. In that role, Gentle will be leading the shipyard’s production and project management
NAVSEA has awarded BAE Systems Jacksonville Ship Repair LLC, Jacksonville, Fla., a $119,261,837 firm-fixed-price contract action for maintenance, modernization, and repair of USS Lassen (DDG 82) fiscal 2023 Depot Modernization Period. The
North Charleston, S.C.,based Detyens Shipyards Inc. has been awarded a $10,051,547 firm-fixed-price contract (N3220523C2142) for a 75-calendar day shipyard availability for the mid-term availability of Military Sealift Command’s fleet replenishment oiler USNS