
USS Fitzgerald is out of dry dock
Naval Sea Systems Command reports that the guided-missile destroyer USS Fitzgerald (DDG 62) has taken another step toward returning to the fleet as a fully ready, combat-capable ship. The ship achieved a
Naval Sea Systems Command reports that the guided-missile destroyer USS Fitzgerald (DDG 62) has taken another step toward returning to the fleet as a fully ready, combat-capable ship. The ship achieved a
BAE Systems San Diego Ship Repair, San Diego, Calif., has ben awarded a $41,895,897 contract for the execution of USS Anchorage (LPD 23) fiscal 2019 selected restricted availability. BAE will provide the
The Board of Directors of Hendry Marine Industries, Inc, Tampa, FL, reports that John P. Gallagher has been appointed as President of Gulf Marine Repair, effective January 29, 2019. Mr. Gallagher, a
Vigor Marine Inc., Portland, OR, has been awarded a $17,044,892 contract for a 75-calendar day shipyard availability for the regular overhaul and drydocking of USNS Carl Brashear (T-AKE 7). Work will include
JANUARY 23, 2019 — Fincantieri Bay Shipbuilding, Sturgeon Bay, WI, has delivered the newly-converted barge Commander to Port City Marine Services (PCMS) of Muskegon, MI. The Commander is a 495’ by 72’
JULY 20, 2019 — Denmark’s Orskov Shipyard and the Port of Frederikshavn have entered into a leasing agreement that will enable an increase in the yard’s drydocking capacity. The port is implementing
JANUARY 16, 2019 — BAE Systems Hawaii Shipyards Inc., Honolulu, Hawaii, has been awarded a $9,576,151 contract modification for scheduled Surface Incremental Availability (SIA) on USS Halsey (DDG 97). The scheduled SIA
JANUARY 4, 2018 — Bouchard Transportation Co., Inc., Melville, NY, reports that Bouchard Barge No. 295 (B. No. 295) has completed a major shipyard overhaul at Gulf Marine Repair, Tampa, FL. Approximately
DECEMBER 21, 2018 — Detyens Shipyards Inc., North Charleston, SC, has been awarded an $11,753,763 contract for a 60 calendar day shipyard availability for the regular overhaul/drydocking of USNS Laramie (T-AO 203).
DECEMBER 20, 2018 — Tersan Shipyard, Yalova, Turkey, will have a new floating dry dock in operation by the end of February 2019. The dry dock has a length of 284 m