Detyens wins $8.1 million MSC contract

NOVEMBER 2, 2018 — Detyens Shipyards Inc., North Charleston, SC, has been awarded an $8,175,517 contract for a 59-calendar day shipyard availability for the mid-term availability of the fast combat support ship

Navy oiler to be overhauled at Boston Ship Repair

MAY 15, 2018 — Boston Ship Repair LLC, Boston, MA, was recently awarded a $16,102,734 firm-fixed-price contract for a 63-calendar day shipyard availability for the regular overhaul dry docking of the Navy

MSC satcom scammer heads for slammer

MAY 8, 2018 — Scott B. Miserendino, Sr., 59, a former contractor at the U.S. Navy’s Military Sealift Command (MSC), has been sentenced to 87 months in prison for his role in

ABS and MSC pioneer major advance in classification

APRIL 9, 2018 — Classification society ABS is engaged in a two-year project with the U.S. Navy’s Military Sealift Command (MSC) to deliver the industry’s first bow-to-stern Condition-based Class asset management program.

Detyens awarded $20.6 million MSC contract

MARCH 31, 2018 — Detyens Shipyards Inc., Charleston, South Carolina, is being awarded a $20,672,008 contract for a 94-calendar day shipyard availability for the regular overhaul and drydocking of USNS Lewis and

Navy oiler goes for repairs at Vigor Marine

MARCH 24, 2018 — Vigor Marine LLC, Portland, OR, was awarded a $7,198,004 firm-fixed-price contract by the U.S. Navy’s Military Sealift Command (MSC) for a 42-calendar day shipyard availability for the midterm

Navy’s latest Expeditionary Fast Transport christened at Austal

FEBRUARY 25, 2018 —The U.S. Navy’s newest Expeditionary Fast Transport, the USNS Burlington (EPF 10), was christened yesterday at a ceremony at Austal USA’s shipyard in Mobile, AL. Austal USA was awarded the contract

GE to build “digital twins” of two MSC ships

FEBRUARY 6, 2018 — Aiming to improve performance and mission readiness, the U.S. Navy’s Military Sealift Command (MSC) is to run a pilot program for GE’s Predix Asset Performance Management (APM) on

Vigor books $8.5 million MSC order

NOVEMBER 15, 2017 — Vigor Marine LLC, Portland, OR, is being awarded an $8,523,020 firm-fixed-price contract for a 42-calendar day shipyard availability for the mid-term availability of USNS Henry J.Kaiser (T-AO 187).

Navy hospital ship gets to work in Puerto Rico

OCTOBER 6, 2017—The 894-ft hospital ship USNS Comfort (T-AH 20) arrived in San Juan, Puerto Rico, on October 3 to help assist in the island’s emergency medical needs and went right to

LOAD MORE