Fassmer to build Germany’s first LNG fueled ferry

OCTOBER 16, 2013 — German ferry operator AG Ems has placed an order with shipbuilder Fassmer GmbH & Co. KG for what will be Germany’s first LNG-fueled ferry. Scheduled for delivery from

Wärtsilä package picked for second LNG-fueled Siem PSV

SEPTEMBER 2, 2013 — Wärtsilä is to supply the design and an integrated solution for a new large platform supply vessel (PSV) that will be operated by Siem Offshore under charter to

Fosen shipyard delivers LNG-fueled cruise ferry

JULY 8, 2013 — Norway’s Bergen Group Fosen shipyard has today completed the successful delivery of MV Stavangerfjord to Fjord Line. The 170 m vessel can carry 1,500 passengers and 600 cars

Wärtsilä solution picked for Harvey Gulf MPSVs

JUNE 18, 2013 — Eastern Shipbuilding Group, Inc., Panama City, FL, has awarded Wärtsilä a contract to supply an integrated solution for the first of the three Multipurpose Support Vessels (MPSV) it

IMO picks DNV for North American ECA LNG study

JUNE 18, 2013 — DNV says that it has been chosen by IMO (International Maritime Organization) to gather knowledge about the potential of LNG powered international shipping in the North American Emission

Wärtsilä ups power of dual fuel engine

JUNE 5, 2013 — Wärtsilä has further developed its dual fuel technology and introduced a more powerful version of its Wärtsilä 34DF engine that increases the efficiency in both liquid and gas

Wärtsilä ups power of dual fuel engine

JUNE 5, 2013 — Wärtsilä has further developed its dual fuel technology and introduced a more powerful version of its Wärtsilä 34DF engine that increases the efficiency in both liquid and gas

LNG fueled cruise ferry hit by another delivery delay

MAY 17, 2013 — Norway’s Bergen Group Fosen shipyard has notified Fjord Line that there will be another delay in delivery of the Stavangerfjord, the first of two LNG-fueled cruise ferries on

Delivery of LNG-fueled cruise ferry delayed

APRIL 18, 2013 — Delivery of Stavangerfjord, the first of two LNG-fueled cruise ferries ordered from Norway’s Bergen Group Fosen shipyard by Fjord Line will be delayed by up to three weeks

HHI introduces new membrane LNG containment system

APRIL 15, 2013 —Korea’s Hyundai Heavy Industries (HHI), the world’s largest shipbuilder, reports that it has developed a high performance Hyundai Membrane LNG Cargo Containment System that has received Design Approval from

LOAD MORE