President of Equinor Wind US says company is ready to go to work on Empire Wind

Beacon Wind takes another step forward

Another U.S. offshore wind project is moving along the regulatory pathway. BOEM has announced a Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for the proposed Beacon Wind project.

CTV with parallel hybrid propulsion system

Parallel-hybrid CTV goes to work at German offshore wind farms

Singapore’s Penguin Shipyard International has delivered the first crew transfer vessel (CTV) to use Volvo Penta’s new parallel hybrid system together with IPS propulsion. Designed by Incat Crowther for Emden, Germany based

South Fork Wind installation vessel

“Steel in the water” at South Fork Wind

South Fork Wind, New York’s first offshore wind farm, yesterday achieved its “steel in the water” milestone with the installation of the project’s first monopile foundation. The development comes within less than

GAO report looks at MARAD staff shortages

GAO to study to impacts of New Jersey offshore wind development

According to Rep. Chris Smith (R-N.J.) the Government Accountability Office (GAO) has officially agreed to launch an investigation into the impacts of New Jersey offshore wind development on the environment, the fishing

hybrid-ready CTV

Louis Dreyfus Armateurs JV orders hybrid-ready CTV at Strategic Marine

Singapore’s Strategic Marine shipyard has booked an order to build a BMT-designed, hybrid-ready StratCat 27 crew transfer vessel (CTV). The order has been placed by the LD Tide joint venture between France’s

Cadeler and Eneti chairs both endorse planned offshore wind installation mega merger

Offshore wind installation mega merger in the works

Two of the largest players in the offshore wind installation market are planning to combine. Cadeler A/S (OSE: CADLR) and Eneti Inc. (NYSE: NETI) today reported that they have entered into an

Electric foiling CTV and daughter craft

Artemis to demonstrate electric foiling CTV at Ørsted wind farm

Belfast, Northern Ireland, based Artemis Technologies is leading a demonstrator project to prove the offshore wind industry capabilities of its first electric foiling crew transfer vessel (CTV) and daughter craft, the Artemis

Vineyard Wind installation vessel

Vineyard Wind installation work kicks off

“We can finally say it – as of today, there is ‘steel in the water,’” said Vineyard Wind CEO Klaus S. Moeller yesterday, as work got underway on installing the first monopiles

Ulmatec gangway

Chouest orders a second Ulmatec SOV gangway system

Hareid, Norway, headquartered Ulmatec Handling Systems has a secured a second contract to supply a motion compensated gangway and logistics support systems to Edison Chouest Offshore (ECO). The Ulmatec system has been

Havfram Wind WTIV

ABB wins major order for Havfram Wind WTIV duo

The two NG20000X-HF wind turbine installation vessels (WTIVs) on order for Oslo-headquartered Havfram Wind are to feature an extensive ABB integrated power, control and propulsion technology solution. Under construction at China’s Yantai

LOAD MORE