NYK takes delivery of Japan’s first LNG fueled tug

NYK has chartered the tug to Wing Maritime Service Corporation, another wholly owned subsidiary that operates 20 tugboats at the ports of Yokohama, Kawasaki, and Chiba and which will operate the Sakigake mainly in  Yokohama and Kawasaki. It is the second environmentally-friendly tugboat to be operated by Wing Maritime which took delivery of the hybrid tug Tsubasa in March 2013.

The Sakigake is equipped with twin Niigata 6L28AHX-DF dual-fuel engines, each developing 1,618 kW. They are the prime movers for a the 360-degree steerable Niigata Z-Peller propulsion system.
The DF engines can use either of LNG and diesel oil, depending on conditions. Compared with conventional tugboats that use marine diesel oil, Sakigake emits about 30 percent less carbon dioxide, 80 percent less nitrogen oxide, and absolutely no sulfur oxide when using LNG as fuel.

NYK says that the small size of most tugboats, the limited amount of space, and the large variation in engine power make it difficult to create an LNG fueled tugboat. Keihin Dock was able to achieve the desired level of environmental performance while maintaining the same hull form and steering performance of existing tugboats. To do this, the shipbuilder made full use of its knowledge and technical strengths, and worked closely with both Niigata Power Systems and Air Water Plant & Engineering Inc.  to develop equipment for supplying LNG.

LNG will be supplied by Tokyo Gas Co and delivered to the vessel from a tanker truck at a pier in Yokohama, with a successful trial fueling being carried out in July.

The project received subsidies from Japan’s Ministry of Economy, Trade and Industry and the Ministry of Land, Infrastructure and Transport, which support projects promising energy-saving logistics and innovative maritime transport improvements. ClassNK also provided joint research support.

The NYK Group has already ordered the world’s first LNG-fueled car carrier, in addition to an LNG supply vessel, and the group is set to participate in the LNG bunkering business.

Second “enhanced” RAmparts tug joins Harley Marine

The Lela Franco, named in honor of the  wife of HMS founder Harley Franco, is a sister ship to the Michelle Sloan delivered earlier this year. Designed by Robert Allan Ltd., both tugs were built at shipbuilder Diversified Marine Inc.’s Portland, OR, shipyard.

The Lela Franco is the sixth tractor tug HMS has added to its fleet in under two years, improving its ship assist and tanker escort capability and bringing more horsepower to the U.S. West Coast. Like its twin sister the Michelle Sloan, it is an enhancement of HMS tugs the Tim Quigg and John Quigg, built in 2004 also by DMI. These enhanced designs developed by Robert Allan Ltd. feature a wider hull, increased bollard pull performance, improved crew accommodations, and a modified skeg.

Particulars of the Lela Franco are as follows:

The tug was designed and constructed to satisfy all applicable USCG rules and regulations and meets or exceed classification society minimum scantling requirements. Tank capacities are as follows:Fuel Oil:          32,800

On trials, the vessel achieved an average bollard pull, ahead, of 69.0 short tons and a maximum of 71.3 short tons, Astern, average bollard pull was 65.4 short tons and maxium was 67.4 short tons.  Free running speed, ahead, was 12.5 knots   

The vessel has been outfitted to the highest standards for a normal operating crew of two, with accommodations for up to six persons. The Master’s cabin is located on the main deck, with two additional double crew cabins located on the lower accommodation deck. There is also a galley and mess room located on the main deck.

The deck machinery comprises a Markey DEPC-48 render-recover type ship assist hawser winch on the bow, spooled with 500′ of 9″ line, and a Markey DEPC-32 towing winch aft with a capacity of 250′ of 6-1/2″ line. In addition, a capstan is installed on the fore deck to facilitate line handling operations.

The raised forecastle and elevated wheelhouse ensure good all-round visibility of the working decks and when handling large barges with high freeboard. The higher freeboard feature also provides a high standard of seakeeping when working in exposed waters, but is configured so as not to impede the ability of the tug to work closely under the flare of the newer generation of large ships.

Main propulsion power for each tug is provided by a pair of CAT 3516C diesel engines, each rated 2,575 bhp at 1,600 rpm, and each driving a Rolls-Royce US 205 Z-drive unit, with a 94.5″ diameter fixed pitch propeller.

The electrical plant consists of two (2) identical CAT C6.6 diesel gen-sets, each with a power output of 125 ekW, 60 Hz.

Ship-handling fenders at the bow consist of one tier of 36″ OD x 18″ ID cylindrical fender at the main deck level, with 12″ loop type Schuyler fenders between the main deck and the knuckle, 11″ laminated bow fenders below, and 12″ hollow D style fenders along the stem and skeg. Tires and 8″ hollow “D” fender provide protection at the main and forecastle sides and sheer lines, and 12″ loop type fendering is used at the stern.

llela francoGA

Vane Bros takes delivery of BHGI designed asphalt barge

SEPTEMBER 8, 2015 — Bristol, RI, based naval architecture and marine engineering firm Bristol Harbor Group, Inc. (BHGI) reports that the Vane Brothers Company, Baltimore, MD, has taken delivery of a BHGI

Mississippi River reopens after slurry spill

SEPTEMBER 8, 2015 — The Coast Guard reported Saturday that traffic was again transiting the Mississippi River as the unified command in Paducah continued to respond to the clarified slurry oil spill

Mississippi River closure continues

SEPTEMBER 4, 2015 —As of 10:50 a.m. today, 23 vessels were awaiting transit down river and 10 were awaiting transit up as the Mississippi River remained closed to all traffic except response

Slurry oil spill causes Mississippi River closure

SEPTEMBER 4, 2015 —The Mississippi River yesterday remained closed to all traffic except response vessels between mile markers 939-922. A queue was in place, six up bound and nine down bound. In

Historic “Boblo boat” heads for renovation

SEPTEMBER 2, 2015 — The Great Lakes Towing Company has been completing a historic contract for the SS Columbia Project — towing the 113 year old “Boblo boat” SS Columbia from Toledo,

Chouest wins MSC tug contract worth potential $35.9 million

AUGUST 30, 2015 — The Department of Defense reported Friday that Edison Chouest’s Alpha Marine Services LLC, Galliano, LA, was awarded a $6,965,712 firm-fixed-priced contract April 22 for the time charter of

Damen delivers ICE class ASD tug to Lithuania

AUGUST 27, 2015 – Damen Shipyards Group has delivered an ASD Tug 2810 ICE to Klasco Towage Assistance, the largest tugboat service provider in the Port of Klaipeda, Lithuania. This is the

ASL books tug and barge contracts worth US$100 million

AUGUST 27, 2015 – Singapore listed ASL Marine Holdings Ltd. reports that its wholly-owned subsidiary, ASL Shipyard Pte Ltd, has secured new shipbuilding contracts worth approximately Singapore $140 million (about US$100 million)

LOAD MORE