
PNSY redelivers SSN to Fleet 28 days ahead of schedule
APRIL 14, 2017 — NAVSEA reports that Portsmouth Naval Shipyard (PNSY) delivered USS Providence (SSN 719) back to the Fleet on April 7 — 23 days ahead of schedule and on budget.
APRIL 14, 2017 — NAVSEA reports that Portsmouth Naval Shipyard (PNSY) delivered USS Providence (SSN 719) back to the Fleet on April 7 — 23 days ahead of schedule and on budget.
APRIL 14, 2017 — General Dynamics-National Steel and Shipbuilding Co., San Diego, California, is being awarded a $22,714,780 modification to a previously awarded cost-plus-award-fee, incentive-fee contract (N00024-15-C-4313) for the FY 2017 drydocking
APRIL 14, 2017 – GE reports that several milestones have been reached on Australia’s Air Warfare Destroyer (AWD) shipbuilding program. The first of the three ships being built for the Royal Australian
APRIL 13, 2016 — Ship repairer EBH Namibia (EBHN) last year won a contract to maintain and repair five tugs being operated by Maersk Group subsidiary Svitzer from the port of Soyo,
APRIL 13, 2016 — Brazil’s Wilson Sons Limited reports that its shipbuilding subsidiary Wilson Sons Estaleiros Ltda, has signed a contract to construct two azimuth tugboats for Saam Smit Towage do Brasil
APRIL 13, 2016 — Wärtsilä and COSCO shipping Heavy Industry Co (CHI) have jointly developed a natural gas operating fleet concept that has now obtained a Lloyd’s Register’s (LR) Approval in Principle
APRIL 13, 2017 — The four LNG-fueled Aframax tankers ordered by Russia’s SCF Group (Sovcomflot) (see earlier story) will be powered Winterthur Gas & Diesel (WinGD) low-speed dual-fuel engines with X-DF low-pressure
APRIL 13, 2017 — Kirby Offshore Marine Pacific LLC of Houston has sold the 1981-built, 3,800 HP U.S. flag, twin screw tug Altair (ex- Osprey) to U.S. West Coast interests. Marcon International,
APRIL 13, 2017 — Louisiana-based shipbuilder Metal Shark has completed its first two vessels for New York’s new NYC Ferry and they are now making their way to New York. Late last
APRIL 12, 2017 — BAE Systems San Diego Ship Repair Inc., San Diego, California, is being awarded a $19,426,118 cost-plus-award-fee contract for the accomplishment of post shakedown availabilities (PSA) for DDG 51