TOTE orders two LNG fueled containerships from NASSCO

DECEMBER 4, 2012 — General Dynamics NASSCO, a wholly owned subsidiary of General Dynamics (NYSE: GD), reports that it has finalized a contract with TOTE, Inc., for the design and construction of

Wärtsilä gets equipment order for LNG-fueled Quebec ferry

DECEMBER 3, 2012 — Wärtsilä has been awarded the contract to supply the gas powered propulsion machinery and corresponding gas storage and handling systems for the LNG-fueled ferry on order for Canada’s

Hyundai Heavy develops new LNG tank design

NOVEMBER 29, 2012 — Hyundai Heavy Industries (HHI), the world’s largest shipbuilder, announced today that it has developed an independent liquefied natural gas storage tank model, the Lobe-Bundle Tank. The Lobe-Bundle Tank

Siem LNG fueled PSV has Wärtsilä design and equipment

NOVEMBER 28, 2012 — Wärtsilä is to supply ship design services and the power and propulsion system for a newbuild LNG powered 5,500 dwt platform supply vessel (PSV) ordered by Norway’s Siem

Incat launches LNG fueled high speed RO/RO

NOVEMBER 21, 2012 —  Australian shipbuilder Incat Tasmania Pty Ltd has launched  what will be the world’s first high speed passenger RO/RO ship to operate on LNG (Liquified Natural Gas) fuel. The

BP Shipping to use Jeppesen VVOS on 52 vessels

NOVEMBER 14, 2012 —  BP Shipping has finalized a contract with Boeing subsidiary Jeppesen that will see the installation of Jeppesen’s Vessel and Voyage Optimization Solution (VVOS) on 52 BP vessels carrying

Waller Marine to develop small-scale LNG terminals

NOVEMBER 13, 2012—Liquefied natural gas has sparked strong interest as a marine fuel because of the abundance of natural gas, relatively low price and attractive environmental performance. One challenge is the ready

Wärtsilä sales of gas-fueled engines top 2,000 mark

NOVEMBER 12, 2012 — Wärtsilä reports that it has now sold more than 2,000 of its gas-fueled engines. They have accumulated more than 7 million operational running hours in both land-based and

First steel cut for Prelude FLNG

OCTOBER 19, 2012 — Shell yesterday celebrated the cutting of first steel at Samsung Heavy Industries’ Geoje shipyard in South Korea for the substrucure of what will be the largest offshore floating

Waller LNG ATB gets ABS approval in principle

OCTOBER 9, 2012 — Classification society ABS has granted approval in principle (AIP) to a new liquefied natural gas (LNG) and regasification articulated tug barge concept introduced by Waller Marine Inc., Houston.

LOAD MORE