TUI Cruises newbuilds to have KONE elevators and escalators
DECEMBER 18, 2012 — KONE is to provide the elevators and escalators onboard the most recent TUI Cruises’ vessel, the Mein Schiff 4. The new cruise ship will be the sister ship
DECEMBER 18, 2012 — KONE is to provide the elevators and escalators onboard the most recent TUI Cruises’ vessel, the Mein Schiff 4. The new cruise ship will be the sister ship
DECEMBER 11, 2012 — Fincantieri’s Marghera, Italy, shipyard yesterday started the building dock phase of construction of Costa Diadema, the future Costa Cruises flagship. With a gross tonnage 132,500 and accommodations for
DECEMBER 10, 2012 — Sembcorp Marine’s subsidiary Sembawang Shipyard has been awarded a Favored Customer Contract (FCC) from Royal Caribbean Cruises Ltd. (RCL), USA, to provide ship repair, revitalisation, upgrading and related
DECEMBER 5, 2012 — IMO’s Maritime Safety Committee (MSC) has agreed that rules to require passenger safety drills to take place prior to, or immediately upon, departure should be made mandatory, in
NOVEMBER 28, 2012 — A cruise ship originally built in 1986 by Kockums Varv, Malmö, Sweden, for Carnival Cruise Lines as MS Jubilee, is now operating as MS Henna for China’s HNA
NOVEMBER 26, 2012 — Port state control authorities in the 27 member Paris MoU will focus their attention on passenger ship safety in 2013. As we reported at the time, following the
NOVEMBER 23, 2012 — Design firms Tillberg Design and SMC Design have selected deck and flooring specialist Bolidt Synthetic Products & Systems to supply flooring for Norwegian Cruise Line’s newest ship, Norwegian
NOVEMBER 21, 2012 — Star Cruises of Malaysia has chosen Metso to refurbish the automation system on its cruise ship MS Star Pisces. The vessel’s new automation will increase reliability and customer
NOVEMBER 19, 2012 —The U.S. Coast Guard, joined by the National Transportation Safety Board, will be part of the Italian-led marine casualty investigation into the January 2012 grounding and partial sinking of
NOVEMBER 9, 2012 — Carnival Cruise Lines has unveiled additional details of the $155 million makeover that will transform Carnival Destiny into Carnival Sunshine during a 49-day dry docking at Fincantieri in