Costa Concordia refloat prep hits a snag
MAY 7, 2014 — Efforts to prepare the wreck of the Costa Concordia for refloating have run into another problem. As we reported previously, the Titan Micoperi salvage consortium has begun installing
MAY 7, 2014 — Efforts to prepare the wreck of the Costa Concordia for refloating have run into another problem. As we reported previously, the Titan Micoperi salvage consortium has begun installing
APRIL 30, 2014 — The committee overseeing the operation to remove the wreck of the Costa Concordia from Giglio Island, Italy, today ordered the temporary suspension of preparatory work. The decisions on
OCTOBER 11, 2013 — Marcon International, Inc. of Coupeville, Washington is pleased to report that after 52 days, the 2,800 BHP twin screw tug “Miss Lis” (ex-Kari A, Marine Pioneer) recently successfully
Singapore-listed Beng Kuang Marine Limited reports that its wholly-owned subsidiary Asian Sealand Engineering Pte Ltd has secured four contracts with an established marine group to construct four 60-meter crane barges. The total