Foss christens first of three Arctic Class tugs

APRIL 13, 2015 — The first of three Arctic Class tugs being built at the  Foss Rainier, OR, Shipyard was christened Thursday, April 9, at the Foss Waterway Seaport in Tacoma, WA.

ABS inks offshore training MOU with Korean shipbuilders

APRIL 3, 2014 — Classification society ABS recently entered into a Memorandum of Understanding (MOU) with the Korea Offshore & Shipbuilding Association (KOSHIPA) to develop and deliver a curriculum of offshore training

ABS gets $8.5 million MSC contract

SEPTEMBER 24, 2014 — American Bureau of Shipping, Houston, Texas, is being issued an $8,500,000 modification under a previously awarded indefinite-delivery/indefinite-quantity contract (N00033-13-D-8015) with firm-fixed-price task orders to provide vessel classification services

ABS approves new LNG coastal barge design

AUGUST 22, 2014—ABS recently awarded an Approval in Principle (AIP) to a new 3,000 m3 capacity Liquefied Natural Gas (LNG) tank barge design. The new LNG transport barge designed was developed by

ABS, Daewoo to jointly develop LNG-fueled drillship

JULY 3, 2014—Leading classification society ABS, Houston, TX, has entered into a joint development project (JDP) with South Korea’s Daewoo Shipbuilding & Marine Engineering (DSME) to develop the first Liquefied Natural Gas-fueled

ABS to class LNG America bunker barges

MAY 22, 2014 — Houston based LNG America has selected ABS as the classification society for North America’s first LNG bunker barges, currently being designed by Jensen Maritime. ABS will assist LNG

Rowan newbuild first with ABS ISQM notation

MARCH 27, 2014 — Classification society ABS reports that Rowan Companies’ newbuild Rowan Renaissance drillship is the first in the world to have earned ABS’ Integrated Software Quality Management (ISQM) notation. Capable

New heavy lift deck cargo barge for Gray Barge

MARCH 26, 2014—Privately held Gray Barge Companies, headquartered in Houma, LA, recently took delivery of a new 300 ft x 100 ft heavy lift deck cargo barge, the first vessel built at

Elliott Bay Design Group gets AIP for LNG bunker barge

MARCH 11, 2014 — Seattle-based naval architecture and marine engineering firm Elliott Bay Design Group (EBDG) has obtained approval in principle from ABS for the design of a 2,000 cubic meter liquefied

New consortium to speed innovation in lightweight metals

FEBRUARY 26, 2014—President Obama announced yesterday the award of funding for a new consortium that will team leading aluminum, titanium and high-strength steel manufacturers with academia and laboratories to pioneer new technology

LOAD MORE