Boston Ship Repair wins $10.9 million Navy contract

USNS Leroy Grumman (T-AO 195) USNS Leroy Grumman (T-AO 195) U.S. Navy photo

DECEMBER 20, 2018 — Boston Ship Repair LLC, Boston, MA, has been awarded a $10,960,315 contract for a 60 calendar day shipyard availability for the Regular Overhaul Dry Docking (ROH / DD) of USNS Leroy Grumman (T-AO 195).

Work will include general services; laundry room deck steel replacement; jacket water pump room steel replacement; ship service diesel generator 60K overhaul; port main engine 24K service; 06 level fan room port side steel replacement, and underwater hull and freeboard preservation.

The contract includes options that, if exercised, would bring its total value to $11,995,109.

Work will be performed in Boston, Massachusetts, and is expected to begin on March 4, 2019, and is expected to be completed by May 2, 2019.

The Navy’s Military Sealift Command, Norfolk, Virginia, is the contracting activity (N3220519C4011).

Newsletter Signup

Subscribe to Marine Daily for breaking marine news