Sea ice delays delivery of first Davie Cecon newbuild

JANUARY 30, 2014 — Delivery of the first of the three construction vessels building for Cecon ASA at shipbuilder Chantier Davie Canada Inc., Lévis, Quebec, has been delayed until sea ice conditions

Vigor Marine wins $6.6 million MSC contract

JANUARY 30, 2014 — Vigor Marine LLC, Portland, OR, is being awarded a $6,655,679 firm-fixed-price contract for a 55-calendar day regular overhaul and drydocking availability of fleet replenishment oiler USNS Yukon (T-AO

Fraser Shipyards plans next phase of modernization

JANUARY 29, 2014 — Fraser Shipyards, on the west end of Lake Superior, in Superior, WI, is planning for the third phase of a facility modernization plan. A Superior Telegram report by

ASL Marine to buy MEO Batam shipyard

JANUARY 27, 2014 — Singapore’s ASL Marine Holdings and Miclyn Express Offshore (MEO) — along with their respective Indonesian shipbuilding subsidiaries – have reached an agreement that will see ASL acquire MEO’s

First LNG-fueled Harvey Gulf OSV launched

JANUARY 22, 2014 — The Gulfport, MS, shipyard of Gulf Coast Shipyard Group (GCSG), Inc., has launched the first of the six 302 ft x 64 ft dual fuel offshore supply vessels

Austal USA launches JHSV 4

JANUARY 19, 2014 —  Austal USA, Mobile, AL, last week successfully launched the USNS Fall River (JHSV 4). The 103 m high speed catamaran was launched in a multi-step process that saw

Gulf Coast Shipyard Group leases additional space

JANUARY 18, 2014 — Gulfport, MS, headquartered Gulf Coast Shipyard Group has leased space at the Port of Gulfport, to complete the series of LNG fueled platform supply vessels that it is

Keppel Singmarine takes GTT LNG system license

JANUARY 17, 2014 — With Singapore aiming to be a hub for LNG bunkering and regional LNG distribution there will be a need for more small to medium scale LNG carriers and

Electric Boat gets $30 million contract mod

JANUARY 17, 2014 — General Dynamics Electric Boat Corp., Groton, CT, is being awarded a $29,848,059 modification to a previously awarded contract (N00024-11-C-2109) to exercise an option for engineering and technical design

New dry dock boosts Hendry ship repair capacity

JANUARY 14, 2014 — Port of Tampa shipbuilder and repairer Hendry Corporation has just completed building a new 2,500 ton lift capacity floating dry dock. Named the Capt. F.M. Hendry, the dry

LOAD MORE