Shipyard News

image
USCG awards five polar icebreaker design study contracts FEBRUARY 22, 2017 — The U.S. Coast Guard today awarded five firm fixed-price contracts for heavy polar icebreaker design studies and analysis. The contracts were awarded to Bollinger Shipyards, LLC, Lockport, LA; Fincantieri Marine Group, LLC, Washington, DC; General Dynamics/National Steel and Shipbuilding Company, San Diego, CA; Huntington Ingalls, Inc.,…
FEBRUARY 24, 2017 — Austal (ASX:ASB) reports that the Detailed Design Review (DDR) for the A$306 million Pacific Patrol Boat Replacement (PPB-R) Project has been successfully completed on time and in accordance with the contracted…
FEBRUARY 24, 2017 — Gulf Island Fabrication, Inc. (NASDAQ: GIFI) reports that its Board of Directors has approved a recommendation from management to place its properties in Aransas Pass and Ingleside, Texas, up for sale…
FEBRUARY 22, 2017 — The U.S. Coast Guard today awarded five firm fixed-price contracts for heavy polar icebreaker design studies and analysis. The contracts were awarded to Bollinger Shipyards, LLC, Lockport, LA; Fincantieri Marine Group,…
FEBRUARY 22, 2017 — On Monday, February 20, NASSCO shipbuilders took the Eco tanker Liberty to sea for the very first time for tests and trials. Designed for increased fuel efficiency and optimized performance], once…
FEBRUARY 20, 2017—Following an order from Korean shipbuilder Hyundai Heavy Industries (HHI), Paris-based engineering firm GTT will equip a new floating storage and regasification unit (FSRU) with its Mark III cryogenic membrane containment system. The…
FEBRUARY 19, 2017 — Shipbuilder Huntington Ingalls Industries (NYSE:HII) reports that executive vice president and general counsel Kellye Walker has been inducted into the DirectWomen's 2017 Board Institute class. She is one of 20 elite…
FEBRUARY 17, 2017 — Vigor Marine LLC, Portland, Oregon, is being awarded a $24,412,704 firm-fixed-price contract for a 120-calendar day shipyard availability for the regular overhaul and drydocking of the submarine tender USS Frank Cable…
FEBRUARY 16, 2017 — The winter repair season is in full swing at Fincantieri Bay Shipbuilding in Sturgeon Bay, Wisconsin. Sixteen Great Lakes bulkers of various sizes are in the shipyard for winter repair: five1,000-foot…
FEBRUARY 16, 2017 —Huntington Ingalls Industries (NYSE:HII) reported fourth quarter 2016 results that beat analysts expectations, delivering an adjusted earnings per share for the quarter of $3.67, compared with the consensus estimate of $2.48, according…
FEBRUARY 16, 2017 — BAE Systems Norfolk Ship Repair, Norfolk, VA, is being awarded a $42,941,944 firm-fixed-price contract for USS Vicksburg (CG 69) fiscal 2017 special selected restricted availability (SSRA).  The contract includes options that,…
Page 1 of 119

Join Marine Log's Email List



News from NASDAQ