Marine Log

Sample releases ballast water treatment guide

ferrysunset 340x255ABS has released a new Guide for Ballast Water Treatment to help vessel owners and operators prepare for compliance with the IMO's International Convention for the Control and Management of Ships' Ballast Water and Sediments, 2004.

The convention is designed to provide a unified instrument to prevent, minimize and ultimately eliminate the transfer of harmful aquatic organisms via ships' ballast water and sediments. As of November 1, 2011, 30 member States representing 26.44 percent of world merchant shipping tonnage had ratified the convention against a required 30 States representing 35 percent of the world gross tonnage.

With the possibility that the convention may enter into force during the first half of 2013, owners are examining options for newbuilds and retrofits that will give them flexibility in terms of costs and operation, says Kirsi Tikka, ABS Chief Engineer and head of the society's environmental solutions efforts.

"The ballast water management regulations can be confusing for shipowners because they contain many unresolved and complex issues," Dr. Tikka adds. "As a result, some owners with newbuilds have elected to incorporate the installation of a ballast water treatment system, while others have chosen to have their vessel outfitted with the piping, electrical arrangements and space necessary to accommodate a ballast water treatment system in the future."

The newly released ABS guide has been developed to assist owners in understanding the classification requirements relating to the convention. In addition to the installation parameters required for any ABS-classed vessel utilizing an IMO member State type approved ballast water treatment system, the Guide offers owners two optional notations to demonstrate further due diligence in their ballast water management practices.

The tiered notations BWT and BWT+ will bring the ballast water treatment system under survey and the class society will review the system for compliance with the guide, confirm the installation design, conduct a survey during installation, periodically evaluate the onboard ballast water management system and perform shipboard function tests. The BWT+ notation signifies that the installed treatment system has been surveyed by an ABS surveyor at the manufacturing facility.

November 7, 2011


Breaking News

November 25, 2015
Swedish owners order LNG fueled tanker series
NOVEMBER 25, 2015 —Three partners in the Gothenburg, Sweden, headquartered Gothia Tanker alliance have ordered a series of 16,300 dwt next generation LNG fueled intermediate product/chemical tankers with LNG propulsion. Furetank Rederi AB has...
November 25, 2015
Great Lakes cadet awarded Crowley scholarship
NOVEMBER 25, 2015 — Crowley Maritime Corporation recently awarded Great Lakes Maritime Academy (GLMA) Cadet Michael Atwell a Thomas B. Crowley, Sr. Memorial Scholarship based on his strong academic record, leadership ability and financial...
November 25, 2015
Rolls-Royce to showcase MTU innovations
NOVEMBER 25, 2015 — Rolls-Royce will showcase its latest marine power innovations, including several MTU commercial marine products and systems, at the upcoming International Workboat Show being held in New Orleans, December 1-3. The MTU brand...
November 25, 2015
IMO ballast water convention set to enter force?
NOVEMBER 25, 2015 — Indonesia yesterday became the 46th state to ratify IMO's Ballast Water Management Convention. Once Indonesia's gross tonnage data are verified, the convention will be set to enter into force worldwide from November 24,...
November 25, 2015
Electric Boat gets Navy awards worth $149.4 million
NOVEMBER 25, 2015 —General Dynamics Electric Boat, Groton, CT,  has received modifications worth a total of $149.4 million to two Navy contracts. The larger award, worth $102,876,417, is for additional lead yard services and development...
November 25, 2015
Seismic survey vessel to become wind farm worker hotel
NOVEMBER 25, 2015 — Giving a new meaning to the term "seismic shift," Dutch shipowner C-Bed is converting its seismic survey vessel, Viking II, for use as a hotel vessel. It has contracted Wärtsilä Ship Design to supply the design for the...
November 24, 2015
Canadian shipbuilders in spat over interim oiler contract
NOVEMBER 24, 2015 — Canadian shipbuilders are embroiled in a spat over the Resolve-Class AOR interim fleet oiler being created by Chantier Davie Canada Inc. by converting a 183 m containership to provide a much needed refueling and resupply...
November 24, 2015
Metal Shark delivers multipurpose port security vessel
NOVEMBER 24, 2015 — Jeanerette, LA-based shipbuilder Metal Shark has delivered a 55 ft multipurpose port security vessel to the Plaquemines Port Harbor and Terminal District in Louisiana.   Based on Metal Shark's Defiant-class monohull...
November 24, 2015
Royal Caribbean to upgrade turbochargers on four ships
NOVEMBER 24, 2015 — MAN PrimeServ has won a contract from Royal Caribbean Cruises Ltd. (RCCL) to retrofit the turbochargers on four cruise liners from its fleet. The contract covers the retrofit of a total of 30 turbochargers aboard the four...
November 24, 2015
Stena Bulk orders three more IMOIIMAX MR tankers
NOVEMBER 24, 2015 — Gothenburg, Sweden, headquartered Stena Bulk has placed an order for three 50,000 dwt IMOIIMAX MR tankers with Chinese shipbuilder CSSC Offshore & Marine Engineering (CSSC OME), Guangzhou. It has also taken out an option...
Close [x]