Marine Log

Sample releases ballast water treatment guide

ferrysunset 340x255ABS has released a new Guide for Ballast Water Treatment to help vessel owners and operators prepare for compliance with the IMO's International Convention for the Control and Management of Ships' Ballast Water and Sediments, 2004.

The convention is designed to provide a unified instrument to prevent, minimize and ultimately eliminate the transfer of harmful aquatic organisms via ships' ballast water and sediments. As of November 1, 2011, 30 member States representing 26.44 percent of world merchant shipping tonnage had ratified the convention against a required 30 States representing 35 percent of the world gross tonnage.

With the possibility that the convention may enter into force during the first half of 2013, owners are examining options for newbuilds and retrofits that will give them flexibility in terms of costs and operation, says Kirsi Tikka, ABS Chief Engineer and head of the society's environmental solutions efforts.

"The ballast water management regulations can be confusing for shipowners because they contain many unresolved and complex issues," Dr. Tikka adds. "As a result, some owners with newbuilds have elected to incorporate the installation of a ballast water treatment system, while others have chosen to have their vessel outfitted with the piping, electrical arrangements and space necessary to accommodate a ballast water treatment system in the future."

The newly released ABS guide has been developed to assist owners in understanding the classification requirements relating to the convention. In addition to the installation parameters required for any ABS-classed vessel utilizing an IMO member State type approved ballast water treatment system, the Guide offers owners two optional notations to demonstrate further due diligence in their ballast water management practices.

The tiered notations BWT and BWT+ will bring the ballast water treatment system under survey and the class society will review the system for compliance with the guide, confirm the installation design, conduct a survey during installation, periodically evaluate the onboard ballast water management system and perform shipboard function tests. The BWT+ notation signifies that the installed treatment system has been surveyed by an ABS surveyor at the manufacturing facility.


November 7, 2011

 

Breaking News

maersk-ahts-newbuilds-feature-wartsila-integrated-solutions
November 27, 2014
Maersk AHTS newbuilds feature Wärtsilä solutions
NOVEMBER 27, 2014 — The new series of six Anchor Handling Tug Supply Vessels (plus four options) ordered from Norwegian shipbuilder Kleven by  Maersk Supply Service last month (see earlier story) will feature fully integrated solutions...
newly-named-15000-teu-containership-ready-to-burn-lng
November 27, 2014
Newly named 15,000-TEU containership "LNG ready"
NOVEMBER 27, 2014—United Arab Shipping Company (UASC)’s first ever LNG-ready ultra large container vessel, the 15,000-TEU M/V Sajir, was recently named at Korean shipbuilder Hyundai Heavy Industries’ shipyard in Ulsan, Korea. The Safir is the...
higgins-takes-reins-as-ceo-at-nichols-brothers-boat-builders
November 27, 2014
Higgins takes reins as CEO at Nichols Brothers
NOVEMBER 27, 2014—Ice Floe LLC dba Nichols Brothers Boat Builders, Freeland, WA, recently named Gavin Higgins as Chief Executive Officer. Higgins brings a wealth of shipyard management experience to his role, more than 30 years of industry...
world’s-largest-lng-powered-psv-delivered
November 27, 2014
World’s largest LNG-powered PSV delivered
NOVEMBER 27, 2014—Norwegian shipbuilder Kleven Verft A/S, Ulsteinvik, recently delivered the 92.2m Rem Eir, what is believed to currently be the world’s largest LNG-fueled Platform Supply Vessel, to Rem Shipping. Based on a VS 4412 design, Rem...
australian-minister-paddles-away-from-canoe-comment
November 26, 2014
Minister paddles away from "canoe" comment
NOVEMBER 26, 2014 — Australian Defense Minister Senator David Johnston was today paddling away from his comment that he wouldn't trust Government owned shipbuilder ASC (formerly Australian Submarine Corporation) "to build a canoe." Today he...
canada-issues-rfp-for-sar-lifeboats
November 26, 2014
Canada issues RFP for SAR lifeboats
NOVEMBER 26, 2014 — The Canadian Government has issued a Request for Proposals (RFP) for the procurement of search and rescue lifeboats as part of the National Shipbuilding Procurement Strategy. Designed by Robert Allan Ltd, the new...
niigata-dual-fuel-engine-gets-classnk-design-approval
November 26, 2014
Niigata dual fuel engine gets ClassNK design approval
NOVEMBER 26, 2014 — Classification society ClassNK has approved the design of a new 28AHX-DF dual-fuel engine developed by Niigata Power Systems Co., Ltd. After trial operational testing, the engine is expected to receive type approval from...
macgregor-equipment-picked-for-intership-newbuilds
November 26, 2014
MacGregor equipment picked for Intership newbuilds
NOVEMBER 26, 2014 — Cargotec says that its MacGregor subsidiary has secured a comprehensive deck equipment contract from New Times Shipyard, in China, for three new 36,500 dwt Laker-class bulk carriers being built for Intership Navigation Co...
rolls-royce-to-showcase-mtu-systems-at-workboat-show
November 26, 2014
Rolls-Royce to showcase MTU systems at Workboat show
NOVEMBER 26, 2014 — Rolls-Royce will showcase several innovative MTU commercial marine products and systems at the upcoming International Workboat Show 2014, Dec. 3-5 at the Morial Convention Center in New Orleans. Highlighting the MTU exhibit...
damen-vlissingen-to-upgrade-helixs-msv-seawell
November 26, 2014
Damen Vlissingen to upgrade Helix's MSV Seawell
NOVEMBER 26, 2014 — Damen Shiprepair Vlissingen, Netherlands, has been awarded a contract by the U.K. unit of Helix Energy Solutions that will see it carry out a major upgrade of the light well intervention and dive support vessel MSV...