August 9, 2004

Bollinger moves R&D and high speed vessels office to St. Rose

Bollinger Shipyards, Inc., Lockport, La., will relocate its research and development engineering office from Slidell, La., and shift the Bollinger high-speed vessels group from Lockport, to the James Business Park in St. Rose, La., in October 2004.

Mike Ellis, Bollinger executive vice-president and chief operating officer said, "This new location in St. Rose will not only help us better serve our current shipyards from a design and engineering standpoint, but it will also help us attract potential employees to fill our future growth plans. Its proximity to the New Orleans Airport and UNO's Maritime Center of Excellence will also be beneficial to our business."

The Slidell research and development office, Bollinger Northshore Engineering, about 45 miles east of the new facility, opened about five years ago. It creates and develops innovative design solutions for commercial and government clients.

Its staff of naval architects, engineers and designers review market conditions and create conceptual and contract designs. Like the Slidell office, the new St. Rose office will be part of Bollinger’s wide area network providing a seamless integration throughout Bollinger’s 14 shipyards.

Its capabilities include: computer lines fairing; design studies; seakeeping; finite element analysis; model testing; proposal management; marketing studies; stability analysis hydrodynamics studies; vessel arrangements, and worldwide regulatory compliance.

Bollinger’s high-speed vessels (BHSV) group supports Bollinger/Incat USA, (www.bollinger-incatusa.com) a strategic alliance between Bollinger Shipyards, Inc., and Incat, Australia (www.incat.com.au) by providing project management, marketing and engineering.

Ellis thanked Albert Laque, St. Charles Parish (county) president, Corey Faucheux, economic development director, and the Sealy Companies for attracting Bollinger to the St. Rose industrial park. He said, "The cooperative and professional partnership demonstrated by the parish was one of the key factors in the final location decision."

MORE NEWS STORIES


REGULATORY OVERLOAD?
Know what maritime regulations are in the works and what you need to do to stay ahead of the curve

Two day conference, Washington, DC September 23 & 24, 2004


Tell a friend: